Cargo Hold Bilge Well Preparation for Bulk Cargoes

Preparing bilge wells and strainer plates before a bulk loading: the IMSBC 2.2.2 requirement, covering methods, bilge line testing and clearing residues after discharge.

Bilge well preparation is the hold preparation step most specific to fine bulk cargoes, because powder that reaches the bilge system packs the strainers and can put the system out of action for the voyage. IMSBC 2.2.2 requires that due consideration be given to bilge wells and strainer plates, for which special preparation is necessary, to facilitate drainage and to prevent entry of the cargoes into the bilge system.

The full article will cover what the Code requires and what the trade does, which are deliberately different things. The Code prescribes an outcome and never a material, while the established method is one or two layers of clean burlap or hessian over the strainer plates, secured with cement wash or tape so that the covering sits flush with the tank top and cannot be dislodged by a bulldozer.

It will also cover bilge line and sounding pipe condition under IMSBC 2.2.3, the schedules that additionally require the bilge system to be tested before loading, bilge monitoring at sea, and the clearing of residues and wash water after discharge.