Chain Locker

The chain locker: volume and self-stowing geometry, the chain pipe and its closures, drainage, watertight boundaries, the bitter end slip and enclosed space risk.

The chain locker stores a ship’s anchor cable when it is not deployed. The design problem is that the cable must self-stow as it comes off the cable lifter, without piling under the chain pipe until it jams or collapses when the ship rolls.

The full article will cover the geometry that achieves this, where depth matters more than plan area, and the separation of port and starboard cables into their own compartments. It will cover the chain pipe and its closures, drainage arrangements and the sump and strainers that handle seabed mud, and the watertight boundaries that make the locker part of the ship’s subdivision.

It will also cover the two safety features that are easy to overlook. The bitter end must be secured through a slip releasable from outside the compartment, so the cable can be let go without sending a person in. And the locker is an enclosed space in every operational sense, with restricted access, no ventilation and an atmosphere that rusting steel and wet mud can render oxygen-deficient.