Hold Cleanliness Inspection and Certificates

Who inspects cargo holds before loading and against what standard: the surveyor's role, the certificate, failure at the berth, and where the cost and delay fall.

A hold cleanliness inspection is the gate between a cleaned ship and a loading berth, and it is a contractual gate rather than a regulatory one for most cargoes. The shipper’s or charterer’s surveyor inspects the holds against the standard named in the fixture, and the certificate or passed inspection is what the owner relies on later when a receiver alleges contamination.

The full article will cover who inspects and on whose behalf, what the inspection actually examines including tank top, frames, brackets, ladders, bilge covers, hatch coamings and the underside of covers, and the documentary output. It will cover the difference between a pass, a conditional pass and a rejection, and the practice of re-inspection after further cleaning.

It will also cover where the consequences fall when holds fail. That turns on the charter party’s cleanliness and off-hire wording, on whether the ship carried adequate cleaning stores, and on whether the cause was something the owner controlled. Advance planning of materials, time and the specified standard at the fixture stage is what prevents the dispute.