Lift Planning and Crane Hand Signals
How a shipboard lift is planned and communicated: the lift plan, the one-signaller rule, the standard signal sets, and the competency standards for the people involved.
A lift plan is the document that records how a specific lift will be made: the load and its weight, the lifting points and the rigging, the geometry and the radius at each stage, the crane’s certified capacity at that radius, the people and their roles, the weather limits, and what happens if the lift has to be aborted with the load in the air. Routine cargo work runs on a generic plan; a heavy, awkward or one-off lift gets its own.
The full article will cover the communication layer, where practice is less standardized than most readers expect. There is no single mandatory international hand signal set for shipboard cranes. ISO 16715:2014 gives a voluntary standard set, the ILO code of practice on safety and health in ports gives its own eight signals and requires the system in use to be agreed and understood by all parties rather than imposed, and neither binds a ship.
What does hold everywhere is the one-signaller rule: only one person gives signals to a lifting appliance, that person is clearly identifiable and positioned to see the load path, the operator acts on no one else, and the sole exception is an emergency stop, which anyone may give. The article will also cover the competency standards for operators, slingers, signallers and assessors.