Cargo Tank Heating on Tankers: Coils, Media and Clauses
How tankers heat cargo with steam coils, thermal oil or deck heaters: IBC Code chapter 7, Codex and FOSFA limits, class rules, and charter heating clauses.
Contents20 sections
Cargo tank heating is the shipboard system of in-tank coils or deck-mounted heat exchangers, supplied with saturated steam, thermal oil or hot water, that keeps a tanker’s cargo above the temperature at which it becomes too viscous to pump, waxes out or solidifies, and below the temperature at which it degrades. The IMO construction rule is chapter 7 of the IBC Code for chemical tankers, which applies “when provided” and does not oblige any ship to heat; the temperatures themselves come from the cargo’s properties, the Codex and FOSFA codes for edible oils, class rules, and the heating clause in the charter party.
Heating decides whether a parcel can be discharged at all. A 2,000-tonne palm oil tank that must rise 10 °C before discharge needs at least two days at the Codex CXC 36-1987 limit of 5 °C per 24 hours, and a cargo that must be held above the practical steam range needs a thermal-oil heater, which brings its own SOLAS fire-safety regime. This article covers the cargoes that are heated, the three heating media, coil design and materials, the heat-duty method, the IBC Code and MARPOL Annex II provisions, class rules, the charter-party clauses that allocate the cost, and the claims that follow a failure.
Why tanker cargoes need heating
A cargo is heated for pumpability and for quality, and many cargoes need both a floor and a ceiling. The floor keeps the cargo liquid enough for the cargo pumps and piping to clear the tank; the ceiling stops the cargo degrading, polymerizing or damaging the ship.
Viscosity and pumpability
Viscosity falls steeply as temperature rises, so a few degrees can separate a cargo that pumps and one that stays in the tank. SHELLVOY 6 Part I (A)(vii) turns that into a contractual line: the owner’s discharge warranty applies only if the cargo’s kinematic viscosity does not exceed 600 centistokes at the discharge temperature charterers require. MARPOL Annex II uses a viscosity line too. Its regulation 1 defines a high-viscosity substance as a Category X or Y product at or above 50 mPa·s at the unloading temperature, which is why heating before discharge can decide whether a prewash is mandatory.
Pour point, cloud point and wax
Waxy crude and residual fuel set solid below their pour point and begin to drop wax crystals at the higher cloud point. Wax that settles on tank bottoms and structure stays behind as sludge, and asphaltene instability in heavy crude adds another source of deposit. The two thresholds are explained in pour point and cloud point. The heating plan uses both figures to set the minimum voyage temperature for a waxy cargo.
Melting point and solidifying substances
Some cargoes are solids at ambient temperature and are shipped molten: palm stearin, tallow, paraffin wax and molten sulfur among them. MARPOL Annex II regulation 1 defines a solidifying substance by the margin between the unloading temperature and the melting point. A product melting below 15 °C is solidifying if unloaded less than 5 °C above its melting point; a product melting at 15 °C or above is solidifying if unloaded less than 10 °C above it. The shipper declares the melting point on the shipping document under IBC Code 16.2.9, so the ship has the figure before loading.
Cargoes carried heated and their temperatures
The cargoes that need heat fall into five groups: vegetable oils and animal fats, waxy crude and residual fuel oil, bitumen, molten sulfur, and a set of chemicals that are either heated themselves or must be protected from heat in the next tank. Only the edible-oil group has a published temperature table from a standards body.
Vegetable oils and animal fats
Codex Alimentarius CXC 36-1987, the Code of Practice for the Storage and Transport of Edible Fats and Oils in Bulk, carries Table 1, the reference temperatures for the main oils. The values below are from the 2015 revision of the Code; Codex lists the Code as last modified in 2026, so check the current text before relying on a row in a dispute.
| Oil or fat | Voyage min to max (°C) | Loading and discharge min to max (°C) |
|---|---|---|
| Palm oil | 32 to 40 | 50 to 55 |
| Palm olein | 25 to 30 | 32 to 35 |
| Palm stearin | 40 to 45 | 60 to 70 |
| Palm kernel oil | 27 to 32 | 40 to 45 |
| Coconut oil | 27 to 32 | 40 to 45 |
| Tallow, voyages over 10 days | 35 to 45 | 55 to 65 |
| Soybean oil | ambient | 20 to 25 |
| Sunflower and rapeseed oil | ambient | 10 to 20 |
| Hydrogenated oils | about the declared slip melting point | 10 to 15 above the slip melting point |
For warmer climates Codex gives coconut oil 30 to 39 °C or ambient. The table is measured as the average of top, middle and bottom readings, each taken at least 30 cm from the coils. A palm oil parcel held at 45 °C for the whole passage is outside the Codex voyage range even though it is below the discharge range. The commercial default where charterers give no instructions is the PORAM Heating Instructions or the FOSFA Heating Instructions, covered below.
Crude oil and residual fuel oil
Heated crude and fuel oil move on oil tankers and product tankers fitted with carbon steel steam coils. MARPOL Annex I regulation 21, in the revised Annex adopted by MEPC.117(52), groups most of these cargoes as heavy grade oil: crude above 900 kg/m³ at 15 °C, fuel oil above 900 kg/m³ at 15 °C or above 180 mm²/s at 50 °C, and bitumen, tar and their emulsions. The heavy grade oil rules apply to oil tankers of 600 tonnes deadweight and above carrying it. Heavy fuel oil carried as cargo needs the same heating that a ship’s own bunkers need in settling and service tanks, on a much larger tank.
ISGOTT 5th edition, 11.1.11, asks masters to consult the operator whenever cargo is to be loaded at more than 60 °C, because hot cargo can damage structure, coatings, valves, pumps and gaskets unless the ship is designed for it. Tanks and lines are to be free of water before cargo above 100 °C is loaded.
Bitumen
ISGOTT 11.1.11 gives the bitumen carrier as its example of a ship specially designed for carrying very hot cargoes. A bitumen tanker is built for that duty, with cargo tanks, pumps, lines and gaskets rated for the temperature. The practical ceiling is the heating medium: saturated steam reaches 200 °C only at 15.55 bar absolute, and Lloyd’s Register caps heating media in oil-tanker cargo spaces at 220 °C “in general”.
Molten sulfur
Molten sulfur is listed in IBC Code chapter 17 as “Sulphur (molten)” with column o references to 15.10 and 16.2.9. IBC 15.10.6 requires cargo temperature controls to cap the sulfur temperature, and 15.10.1 requires the vapor space to be kept below half the lower explosive limit of hydrogen sulfide, stated in the Code as below 1.85% by volume. The solid form in dry bulk is a different cargo under a different code: see the sulphur IMSBC schedule. Molten sulfur carriage and the hydrogen sulfide hazard on board have their own articles.
Heated chemicals and heat-sensitive neighbors
A chemical tanker heats some parcels and must keep heat away from others on the same voyage. IBC Code 16.6, “Cargoes not to be exposed to excessive heat”, applies where column o cites it. It requires a product liable to polymerize, decompose, become thermally unstable or evolve gas under local overheating to be segregated from cargoes hot enough to start the reaction (16.6.1), its own heating coils blanked off or secured (16.6.2), and it keeps heat-sensitive products out of uninsulated deck tanks (16.6.3) or out of deck tanks altogether (16.6.4).
The Stolt Groenland casualty is the documented case. MAIB Report 9/2021 found that a cargo tank of styrene monomer burst from runaway polymerization at Ulsan on 28 September 2019, that the styrene had been affected by heat from other heated cargo tanks, that the heat transfer to adjacent cargoes was not fully appreciated, and that the styrene temperature was not monitored.
Heating media: steam, thermal oil and hot water
Three media carry the heat: saturated steam from the ship’s boilers, thermal oil from a dedicated heater, and hot water. The choice follows the cargo’s temperature ceiling and its sensitivity to a hot coil surface.
Saturated steam
Steam is the default on crude, product and most chemical tankers because the ship already makes it for fuel heating and the hotel load. It gives up its heat by condensing on the coil surface, at a temperature fixed by its pressure. The values below are computed from the IAPWS Industrial Formulation 1997 (IAPWS-IF97), with gauge pressure taken over 1.01325 bar.
| Supply pressure (bar gauge) | Saturation temperature (°C) | Latent heat (kJ/kg) |
|---|---|---|
| 1.5 | about 127 | Codex CXC 36-1987 ceiling for edible oils |
| 3 | 143.7 | 2,133 |
| 5 | 158.9 | 2,085 |
| 6 | 165.0 | 2,065 |
| 7 | 170.5 | 2,047 |
| 10 | 184.1 | 1,999 |
| 15 | 201.4 | 1,934 |
Latent heat falls as pressure rises, so raising steam pressure to push more heat into a cold cargo buys temperature difference at the coil, not more heat per kilogram. For edible oils the ceiling is set by the cargo rather than the boiler: Codex CXC 36-1987, 4.1.1, says steam should not exceed 150 kPa gauge, about 127 °C. Boiler design, feed water and the steam system as a whole are covered in marine boilers and steam systems.
Thermal oil
Thermal oil reaches temperatures that steam could only reach at very high pressure. Saturated steam at 200 °C is at 15.55 bar absolute; at 300 °C it is at 85.9 bar absolute. A thermal-oil heater circulates a synthetic or mineral heat-transfer fluid through a fired or exhaust-gas heater and back through the coils, with the expansion tank vented to the weather under ABS 4-4-1/13.1.3. The circuit is pumped and pressurized, and ABS requires a relief valve discharging to a collection tank (13.1.1), so it is certified pressure equipment rather than an atmospheric system.
The trade-off is fire. Eastman’s bulletin TF-8695A for Therminol 66 gives a maximum bulk temperature of 345 °C, a maximum film temperature of 375 °C, a closed-cup flash point (ASTM D93) of 170 °C and an autoignition temperature (ASTM E659) of 374 °C, and states that the fluid is not a fire-resistant heat transfer fluid. A circuit running above 170 °C is above that fluid’s flash point. Lloyd’s Register (July 2022, Pt 5 Ch 15, 6.3.1) requires a combustible heating medium in cargo heating to have a closed-cup flash point of at least 60 °C, and 6.4.4 requires the arrangement to rule out contamination of the thermal oil with cargo in normal operation.
Hot water
Hot water gives the lowest coil surface temperature and is the Codex preference for edible oils: CXC 36-1987, 3.1.5, calls hot water at about 80 °C the best procedure. The water is heated by steam or by the thermal-oil circuit through a heat exchanger. The lower surface temperature protects oils that scorch and chemicals that react at a hot wall, and IBC 15.13.7 requires an indirect low-temperature system for a molten inhibited cargo where steam coils would overheat it.
Comparison of heating media
| Criterion | Saturated steam | Thermal oil | Hot water |
|---|---|---|---|
| Heat source | Auxiliary boiler or exhaust-gas economizer | Fired or exhaust-gas thermal-oil heater | Heat exchanger from steam or thermal oil |
| Temperature governed by | Steam pressure | Heater outlet control | Water circuit control |
| Main use | Crude, fuel oil, most chemicals | Bitumen and other very hot cargo | Edible oils, heat-sensitive chemicals |
| Leak into cargo | Water | Oil | Water |
| Fire load in the circuit | None | High: circuit above flash point | None |
| Key rule | IBC 7.1, LR Pt 5 Ch 15 Section 6 | SOLAS II-2/4.2.4, ABS 4-4-1/13, LR Pt 5 Ch 14 12.2 | Codex CXC 36-1987, 3.1.5 |
Heating coils and deck-mounted heat exchangers
Heat reaches the cargo either through coils laid inside the tank or through a heat exchanger on deck. Both are governed by the same IMO and class rules on isolation, pressure and leak detection.
Coil arrangement inside the tank
In-tank coils sit low in the tank so the heated cargo rises and sets up natural convection. Codex CXC 36-1987, 3.1.5, puts edible-oil coils on legs about 7.5 cm (3 inches) above the bottom and sizes them at about 0.1 m² of coil surface per tonne of tank capacity where the fat has to be melted and 0.05 m² per tonne for heating up only. On those ratios a 2,000-tonne tank needs about 100 m² of coil to heat palm oil and about 200 m² to melt stearin from solid.
The IMO and class rules add four arrangement requirements:
- Isolation per tank. IBC Code 7.1.3 requires valves to isolate each tank’s heating system and allow manual regulation of flow; LR Pt 5 Ch 15, 6.4.2, requires isolating valves at the inlet and outlet of each tank circuit.
- Blanking. LR 6.2.1 requires spectacle flanges or spool pieces in the supply and return within the cargo area, or blanking per tank, so a coil can be positively separated from the system.
- Penetrations. LR 6.4.1 allows supply and return lines to penetrate the cargo tank only at the top, with the main supply lines above the weather deck.
- Pressure above cargo head. IBC 7.1.4 requires the heating medium to be at a higher pressure than the maximum head the tank contents can exert on the circuit, so a leak drives medium into the cargo rather than cargo into the steam system. LR 6.4.5 and 46 CFR 153.434 say the same, and LR allows draining and blanking the circuit instead when it is not in use.
IBC 7.1.2 adds that “consideration shall be given to the surface temperature of heating coils or ducts to avoid dangerous reactions from localized overheating”. The rule addresses the coil wall, not the bulk average: a cargo can read in range on the thermometer while the film on the coil is far above it.
Deck-mounted heat exchangers
A deck heater draws cargo from the tank, heats it in a heat exchanger on deck and returns it. Codex CXC 36-1987, 3.1.5, accepts external heat exchangers for edible oils provided there are procedures to detect leaks. Deck heaters keep the hot surface out of the tank and allow the exchanger to be opened and cleaned without tank entry, at the cost of running a pump or a dedicated circulation line for the duration of heating. FOSFA A 2.3.1 applies the stainless-steel rule to the tubes and internal shell of heat exchangers as well as to coils.
Coil materials
The material follows the cargo range. Carbon steel coils are standard on crude and product tankers; ABS (2018), 4-6-2 Table 3, sets a corrosion allowance of 2.0 mm for steam heating coils in cargo tanks against 0.8 mm for saturated steam piping elsewhere, and LR Pt 5 Ch 12, 8.1.1, allows hot-dip zinc or aluminum coated carbon steel coils for cargo and slop tanks to be pressure tested after coating.
Edible oils require stainless steel. FOSFA Qualifications A 2.3.1 makes stainless coils and heat-exchanger tubes a condition of carrying oils and fats under FOSFA contracts, and Codex 3.1.5 rules out alloys containing copper as unsuitable. Duplex and super-duplex stainless steels are an alternative coil material on some chemical tankers. IBC 7.1.2 requires the heating medium itself to be of a type approved for use with each cargo, which matters on a thermal-oil ship that loads a chemical reactive with the oil. The cargo tank coating has its own temperature limit, which can be lower than the cargo’s.
Heating duty and steam demand
The heating plant has two loads: the steady loss through the tank boundaries while the cargo is held at temperature, and the heat-up load when the cargo has to be raised. Both are simple energy balances; the difficulty is in the inputs.
Steady-state heat loss
The holding duty is the sum of the losses through each boundary of the tank: bottom and sides to the sea or to ballast tanks, deck to the air, and bulkheads to adjacent cargo.
Cargo Heating Duty
where
| \(Q\) | Steady-state heat loss the heating system must replace | W |
| \(U\) | Overall heat-transfer coefficient of the tank boundary, from yard or class design data | W/(m^2 K) |
| \(A\) | Boundary area exposed to each ambient medium (sea, air, adjacent tank) | m^2 |
| \(\Delta T\) | Cargo temperature minus the ambient temperature on the far side of that boundary | K |
Source: Steady-state heat transfer through a composite wall, summed boundary by boundary; U and A from the ship's heating calculation approved by the classification society
Each boundary has its own \(U\), area and temperature difference, so the calculation is run boundary by boundary and summed. The \(U\) values come from the ship’s own heating calculation. On a double-hull tanker the bottom and side boundaries face ballast spaces rather than the sea, which changes both the area and the ambient temperature used for each boundary.
Heat-up load
Raising a cargo’s temperature needs the cargo’s full heat capacity over the time allowed:
$$ Q_{warm} = \frac{m \cdot c_p \cdot \Delta T}{t} $$With an assumed specific heat of 1.9 kJ/(kg·K), raising 30,000 tonnes of crude by 15 K in 24 hours takes \(30{,}000{,}000 \times 1{,}900 \times 15 / 86{,}400\), about 9.9 MW, on top of the holding duty. At 2,386 kJ per kilogram of steam (6 bar gauge supply, condensate returned at 90 °C, worked below) that is about 4.1 kg/s, or 14.9 tonnes of steam an hour. For edible oils the Codex limit of 5 °C per 24 hours makes heat-up slow regardless of plant size.
Steam consumption
Steam demand is the duty divided by the enthalpy the steam gives up between supply and condensate return:
Steam Consumption
where
| \(\dot m\) | Steam mass flow | kg/s |
| \(\dot Q\) | Heat duty delivered to the cargo | kW |
| \(h_s\) | Specific enthalpy of the supply steam | kJ/kg |
| \(h_{fw}\) | Specific enthalpy of the condensate returned from the coil | kJ/kg |
Source: IAPWS Industrial Formulation 1997 (IAPWS-IF97) for the thermodynamic properties of water and steam
At 6 bar gauge, IAPWS-IF97 gives supply steam 2,763 kJ/kg; condensate returned at 90 °C carries 377 kJ/kg. Each kilogram gives up 2,386 kJ, so a 500 kW tank duty needs 0.21 kg/s, about 750 kg/h. The figure includes the heat taken out of the condensate as it cools below saturation. If the condensate leaves at saturation (697 kJ/kg at 6 bar gauge) the steam gives up only 2,066 kJ/kg and the same duty needs 0.24 kg/s, about 15% more steam than with subcooling. A steam trap that passes live steam throws that margin away.
Heating instructions and the heating plan
Heating instructions come from the charterer or cargo interests and state the temperatures to maintain on passage and to reach for discharge. The master’s heating plan converts them into a daily schedule by tank, checked against boiler capacity and the rate limits for the cargo.
For vegetable oils and fats there is a published default. Paragraph 4 of the FOSFA Operational Procedures (1 April 2020) provides that, absent charterers’ instructions, the FOSFA Heating Instructions or the PORAM Heating Instructions apply, and that the temperature of the oil or fat shall be recorded daily; if receivers require it, a chart signed by the master or an authorized agent is provided. The FOSFA operational procedures also require a FOSFA Combined Master’s Certificate describing the heat-transfer medium (A 2.3.2) and full class with an IACS member (1.1). The sale contract ties back to the ship: FOSFA Contract No. 81 (September 2011 revision) lists a copy of the notice instructing the master to follow the PORAM Heating Instructions among the shipping documents the seller tenders.
Codex CXC 36-1987, 4.1.1, sets three operating rules that belong in every edible-oil heating plan:
- Heat no faster than 5 °C in any 24 hours.
- Keep steam at or below 150 kPa gauge.
- Do not start heating until the coils are completely covered.
Rule 1 fixes the start of heat-up. Palm oil carried at the Codex voyage maximum of 40 °C and discharged at the 50 °C minimum needs 10 °C of rise, so heating for discharge begins at least 48 hours out; stearin rising from 45 °C to 60 °C needs three days. For NLS cargoes the plan must match the Procedures and Arrangements Manual: appendix 4 of MARPOL Annex II, section 3.4, requires the Manual to give the heating requirements for cargoes that must be at a minimum temperature during unloading, the control of the heating system and the method of temperature measurement, and section 3.5 covers the procedure when heating fails.
IBC Code requirements for cargo temperature control
The IBC Code regulates heating in three places: chapter 7 for the system, chapter 16 for the shipping document and heat-sensitive cargo, and chapter 15 for product-specific rules. The chapter 7 text is that of the revised Code adopted by MSC.176(79) on 10 December 2004, in force 1 January 2007; later amendments through MSC.526(106), in force 1 July 2024, did not change 7.1, 15.10 or 16.6.
Chapter 7: cargo temperature control
IBC Code chapter 7 has six requirements for heating and cooling systems:
| Paragraph | Requirement |
|---|---|
| 7.1.1 | When provided, heating or cooling systems are constructed, fitted and tested to the satisfaction of the Administration |
| 7.1.2 | The medium is approved for use with the specific cargo; coil and duct surface temperature is considered to avoid localized overheating |
| 7.1.3 | Valves isolate each tank’s system and allow manual regulation of flow |
| 7.1.4 | Medium pressure is higher than the maximum head the tank contents can exert |
| 7.1.5 | Means of measuring cargo temperature, restricted or closed type where column j requires; an alarm where over- or under-temperature could result in a dangerous condition |
| 7.1.6 | Toxic products under 15.12, 15.12.1 or 15.12.3: an independent circuit outside the machinery space, a system external to the tank, or sampling of the medium before it recirculates |
The 7.1.6 sampling route requires the coil return to be tested for cargo at the start of heating and on first use after an unheated toxic cargo. Chapter 7 contains no voyage heating-capacity calculation, no temperature record and no retention period.
Chapter 16 and the shipping document
IBC 16.2.6 requires the shipping document to give the cargo’s viscosity at 20 °C and, where that exceeds 50 mPa·s, the temperature at which the cargo has a viscosity of 50 mPa·s. IBC 16.2.9 requires the melting point. Those two figures let the ship check the MARPOL Annex II high-viscosity and solidifying definitions against its planned unloading temperature. IBC Code chapter 16 also carries the 16.6 heat-exposure rules described above.
Chapter 17 and chapter 15
IBC Code chapter 17 has no heating column. Under the legend revised by MSC.460(101), adopted 13 June 2019 and in force 1 January 2021, column l is fire protection and column o lists the chapter 15 and 16 paragraphs that apply. Palm oil, palm stearin and highly refined paraffin wax carry “15.19.6, 16.2.6, 16.2.7, 16.2.9”; molten sulfur carries “15.10, 16.2.9”. Footnote k notes that the ship type for vegetable oils “might be subject to regulation 4.1.3 of Annex II”, under which an Administration may exempt ships certified for individually identified vegetable oils from the construction requirements of Annex II regulation 11.
Chapter 15 adds the product rules: 15.10 for molten sulfur, 15.13.7 for molten inhibited cargoes that must never crystallize wholly or partially, and 15.2 for ammonium nitrate solution, which carries its own heating-medium and alarm limits. The ship’s Certificate of Fitness lists the products and their conditions of carriage; the MSC.176(79) model form has no field for heated tanks.
MARPOL Annex II and Annex I provisions for heated cargoes
MARPOL regulates heated cargo through residue rules, not heating rules. Annex II, in the text revised by MEPC.118(52), adopted 15 October 2004 and in force 1 January 2007, turns on the temperature at unloading:
- Definitions. Regulation 1 defines high-viscosity substances (50 mPa·s or more at the unloading temperature) and solidifying substances (by margin above the melting point).
- Prewash. Regulation 13.7.1.3 requires the appendix 6 prewash for Category Y high-viscosity or solidifying substances, with residues to a reception facility until the tank is empty. Regulation 13.7.1.2 requires a prewash for any Category Y or Z tank that was not unloaded in accordance with the Manual, which a heating failure can cause.
- Wash water temperature. Appendix 6 requires hot water of at least 60 °C, unless the substance’s properties make washing less effective, and asks that tanks that carried a solidifying substance be heated before washing where possible.
- Persistent floaters. MEPC.315(74), in force 1 January 2021, added regulation 13.7.1.4 and the regional prewash in 13.9, for North West European waters, the Baltic Sea area and Western European waters, for Category Y persistent floating products with a viscosity of 50 mPa·s or more at 20 °C and/or a melting point of 0 °C or more, marked 16.2.7 in column o.
- Records. The Cargo Record Book is retained for three years after the last entry under regulation 15.5. Regulation 16 is measures of control by surveyors, including the Category X prewash in 16.4; it contains no temperature provision.
Heating before discharge is a pollution-control measure as well as a commercial one. A product melting at 20 °C and unloaded at 32 °C sits 12 °C above its melting point, outside the solidifying definition for that discharge, so the appendix 6 prewash is not triggered on that ground. MARPOL Annex I contains no heating provision; its relevance is the heavy grade oil definition in regulation 21 and the crude oil washing regime, where a waxy crude washed cold leaves the residue COW is meant to remove.
Class rules and national overlays
Classification society rules supply the engineering detail that the IBC Code leaves to “the satisfaction of the Administration”, and they apply to oil tankers that the IBC Code does not reach at all. Section numbers below are from the editions named; each society renumbers between editions.
Lloyd’s Register
The Lloyd’s Register Rules and Regulations for the Classification of Ships, July 2022, set the heating rules for oil tankers in Pt 5 Ch 15:
- 1.5.1: steam or other fluid in pipes or heating coils in cargo spaces is not to exceed 220 °C; on chemical and gas tankers the limit is that of the temperature class of the electrical equipment required in the cargo area.
- 6.3.1: a combustible heating medium has a closed-cup flash point of 60 °C or above.
- 6.3.2: in general the heating medium temperature is not to exceed 220 °C.
- 6.4.3: steam or water returns go to an observation tank in a well-ventilated, well-lit part of the machinery space remote from the boilers.
- 6.5.1: means to measure cargo temperature, and an alarm where overheating could result in a dangerous condition.
LR Pt 5 Ch 14, 12.2, covers thermal fluid heaters: burners shut off automatically on low expansion-tank level, low fluid flow and low fluid pressure; outlet temperature has a first-stage high alarm and a second-stage burner shut-off, with independent sensors and circuits (12.1.4); and a standby circulation pump starts before the low-pressure shut-off (12.2.2). LR Pt 1 Ch 3 has annual and intermediate survey items for chemical-tanker heating, temperature devices and alarms.
ABS
ABS Rules for Building and Classing Marine Vessels, 2018, Part 4, cover thermal oil heaters in 4-4-1/13: a relief valve to a collection tank, sampling means and onboard test facilities, an expansion tank vented to the weather, and a Table 7 shutdown list covering flame failure, scanner failure, forced-draft failure, loss of control power, low expansion-tank level, high outlet temperature, low circulation pressure or flow, and high flue-gas temperature. 4-4-1/13.3.6 requires a fixed fire-extinguishing system in the heater furnace with local and remote release. DNV, Bureau Veritas and the other members of IACS publish their own rules, with their own section numbers and limits.
United States: 46 CFR Part 153
The United States applies its own heating rules to hazardous bulk liquids under 46 CFR Part 153. Section 153.430 requires heating systems to meet the marine engineering and electrical subchapters, with separate valving and manual regulation of the heat transfer rate; 153.434 requires the heating fluid pressure to exceed the cargo pressure; 153.436 requires the fluid to be compatible with the cargo. Section 153.440 requires a remote-reading thermometer sensing the cargo at the bottom of every heated tank, a second at mid-height for high-viscosity cargo and cargo melting above 0 °C, and a readout at the transfer control station. Section 153.1002 blanks coils in tanks carrying heat-sensitive cargo, and 153.1108(b) sets prewash water of at least 60 °C (140 °F) at the washing machine. The US text still uses the pre-2007 categories A to D.
Cargo temperature measurement and records
Every heated tank needs a means of measuring cargo temperature under IBC 7.1.5 and LR Pt 5 Ch 15, 6.5.1, but no IMO instrument requires a voyage temperature log or sets a retention period for one. The records that exist are imposed by contract, trade rules and one national regulation:
- BPVOY4 clause 24: the master advises each tank’s temperature daily at noon local time.
- FOSFA Operational Procedures 4: a daily temperature record, and a signed chart if receivers ask.
- 46 CFR 153.908(c) and (d): two readings during discharge, the first within 30 minutes of the start of transfer and the second within 30 minutes before the main pump stops, entered in the Cargo Record Book.
- Codex CXC 36-1987, 3.1.8: temperature sensors and controls to prevent overheating, with thermometers sited away from the coils and automatic recording thermometers described as useful.
Temperatures are read on the cargo gauging system or by portable thermometer through a closed or restricted gauging point. The record is the owner’s primary evidence in a claim and the charterer’s evidence in a heating-cost dispute: BPVOY4 clause 25 makes the reimbursement of heating bunkers conditional on copies of the ullage and temperature records for the whole laden voyage. At port state control, the Paris MoU deficiency list of 1 July 2024 has code 14205 for cargo heating systems carrying Category Y substances and 12105 for temperature control; there is no code for a missing log.
Charter-party heating clauses
A heating clause states the temperatures the ship must reach and hold, the standard of that obligation, and who pays for the fuel and the time. The standard ranges from due diligence to a warranty of capability. The wording below is from the published forms; confirm it against the form actually fixed, because riders often replace it. Charter-party heating clauses are also treated as a subject in their own right.
Voyage charter forms
| Form | Clause | Standard | Temperature | Extra heating fuel |
|---|---|---|---|---|
| ASBATANKVOY (1977) | Part II cl 1 | Owner to “exercise due diligence to maintain the temperatures requested” | As requested; Part I box “Coiled: Yes/No” | Not addressed in cl 1 |
| SHELLVOY 6 (2005) | Part I (A)(iv); Part II cl 27 | Ship “shall … Maintain” loaded temperature or the Part I figure, whichever is lower; best endeavours to raise or lower | Figure stated in Part I (A)(iv) | Charterers pay at replacement cost for a requested change |
| BPVOY4 | Cl 24 and 25 | Owners undertake capability to maintain up to 60 °C | Up to 60 °C | For a requested raise, charterers reimburse by formula, against ullage and temperature records |
| ExxonMobil VOY2005 | Cl 25 “HEAT” | Owner warrants capability to heat to and maintain 135 °F | Up to 135 °F (57 °C) | Charterer pays for a requested raise |
ASBATANKVOY qualifies both the condition of the “heater coils” and the duty to maintain temperature by due diligence. SHELLVOY 6 clause 27 states an obligation to maintain, and its clause 32(1) exceptions, which include latent defect, leave Part I clause (A) and Part II clauses 1 and 2 unaffected. Whether the clause 1 due-diligence obligation can be argued as the measure of clause 27 has not been decided in any reported case. BIMCHEMVOY 2008 is the BIMCO chemical-parcel voyage form.
Failure has named consequences. BPVOY4 clause 24 makes owners responsible for any resulting loss, damage, cost or expense, and time lost does not count as laytime or demurrage. ExxonMobil VOY2005 clause 25 lets the charterer hold the ship off berth or suspend discharge at owner’s time and expense, with clause 21(d) providing for off-berth time on failure of the pumping or heating warranties. A litigated SHELLTIME 4 rider read “vessel to maintain loaded temperature maximum 135 deg f max loading temp 165 deg f” (Golden Fleece Maritime Inc v ST Shipping & Transport Inc [2007] EWHC 1890 (Comm)), although the case itself was decided on MARPOL Annex I.
Time charters and heating fuel
On a time charter the charterer buys the fuel, so the question is the performance warranty rather than the bunker bill. SHELLTIME 4 clause 7(a) has charterers provide and pay for all fuel except fuel used for domestic services, and clause 24(a) states the consumption warranty for all purposes except cargo heating and tank cleaning. Heating consumption is recorded separately in the noon report and excluded from the speed and consumption warranty calculation. BIMCHEMTIME 2005 is the BIMCO chemical-tanker time form.
Laytime, demurrage and time bars
Heating time interacts with laytime in both directions. Under SHELLVOY 6 clause 27, delay from a charterers’ request to raise or lower the temperature counts as laytime, or as demurrage if the ship is already on demurrage; under BPVOY4 clause 24, time lost through the owner’s failure to maintain temperature does not count. SHELLVOY 6 clause 6(3) bars heating claims unless they reach owners fully documented within 90 days of completion of discharge. The fixed voyage charter party wording, riders included, decides how heating time and cost are treated.
Cargo claims arising from heating
A heating failure that damages cargo is a claim under the bill of lading as well as under the charter. SHELLVOY 6 clause 32(3)(b) routes cargo claims to the Hague-Visby Rules, which require the carrier to exercise due diligence to make the ship seaworthy before and at the beginning of the voyage (Article III rule 1) and to properly and carefully carry, keep and care for the cargo (Article III rule 2).
The carrier’s likely defence is Article IV rule 2(a), the exception for neglect in the navigation or management of the ship. CSAV v MS ER Hamburg, [2006] EWHC 483 (Comm), arose from an overheated bunker tank that damaged calcium hypochlorite stowed next to it. Morison J treated the Article IV rule 2(a) question as “quintessentially one of fact” and upheld the finding that the management exception applied, observing that heating the bunker tank “was to facilitate the transfer of oil from it to the engines. It was a single act which did not relate in any way to the care of the cargo”. The test the court applied is care of cargo against running of the ship. Heating the cargo itself is directed at the cargo, which on that test puts a cargo heating failure under Article III rule 2 rather than under the exception; that application follows from the test and is not itself a holding of the case.
Coils that were defective at the start of the voyage raise seaworthiness under Article III rule 1, and ASBATANKVOY’s express due-diligence wording on the heater coils mirrors that duty. Contamination from a leaking coil, whether water, thermal oil or steam condensate, turns a heating claim into a contamination claim. The survey method is covered in marine cargo damage investigation, and the time limits in cargo claim time bars.
Heating failures and heat transfer between tanks
Heating fails in three ways: too little heat, too much, and heat in the wrong tank.
Too little heat leaves cargo that will not pump. The residue stays as cargo remaining on board, becomes a shortage claim against the ship, and, for an NLS cargo not unloaded in accordance with the Manual, triggers the Annex II regulation 13.7.1.2 prewash before the ship leaves port. The P&A Manual section 3.5 procedure for heating failure is the document the surveyor will ask for.
Too much heat damages the cargo or the ship. Codex CXC 36-1987 sets the edible-oil steam and rate limits because a hot coil surface degrades oil at the wall even when the bulk reading is in range. Hot cargo loaded into a ship not designed for it damages coatings, gaskets and pump seals, which is the ISGOTT 11.1.11 reason for consulting the operator above 60 °C.
Heat in the wrong tank is the chemical-tanker risk. IBC 16.6.1 requires heat-sensitive products to be segregated from hot cargo, and IBC 16.6.2 and 46 CFR 153.1002 require their own coils to be blanked. The Stolt Groenland report shows the consequence when the stowage plan treats adjacency as a compatibility question only and not a thermal one. A cold cargo loaded next to a heated tank can also expand by more than its ullage allows as it warms on passage, so the loading plan uses the temperature the cargo will reach, not the loading temperature.
Coil testing, leak detection and survey
Coils are pressure tested after installation to 1.5 times the design pressure and not less than 0.4 MPa (4 bar): LR Pt 5 Ch 12, 8.2.1, and ABS 4-6-2/7.3.3(b). A coil designed for 7 bar gauge is tested at 10.5 bar. At the renewal survey of a double-hull oil tanker, IACS UR Z10.4 Rev.17 (May 2022), 2.2.1.3, requires cargo and ballast piping within tanks to be examined and operationally tested to working pressure; it does not name heating coils. Under the enhanced survey programme, the Z10.4 Annex selects ballast tanks bounding cargo tanks fitted with heating coils for thickness gauging. The installation, survey and pre-loading tests are compared in cargo heating coil pressure testing.
At sea the condensate is the leak detector. LR Pt 5 Ch 15, 6.4.3, requires steam and water returns to lead to an observation tank in the machinery space, where oil or chemical in the condensate shows before it reaches the boiler. Steam traps and condensate observation tanks are treated separately. ISGOTT 5th edition, 11.1.9.2, calls for the coils to be tested before a sour cargo so hydrogen sulfide cannot pass into the low-pressure steam system, and IBC 7.1.6 applies the same logic to toxic chemicals by keeping the circuit out of the machinery space or sampling it before recirculation.
Thermal-oil heater safety
A thermal-oil heater carries a large volume of flammable fluid above its flash point, so the SOLAS fire rules for oil systems apply to it. SOLAS chapter II-2, regulation 4.2.4, covers flammable oils employed under pressure in heating systems and applies the fuel-oil arrangements for leak containment, pipe construction and hot-surface protection; regulation 4.2.2.6.1 requires surfaces above 220 °C that may be impinged by a leak to be insulated.
Class rules supply the automation. The ABS 4-4-1 Table 7 shutdowns and the LR Pt 5 Ch 14, 12.2, two-stage high-temperature protection are listed above; ABS 4-4-1/13.3.6 requires fixed fire extinguishing in the heater furnace, and 13.5 requires an exhaust-gas thermal-oil heater to have a fixed fire-extinguishing and cooling system in the exhaust piping. Fixed fire-fighting systems for the space follow SOLAS II-2 and the FSS Code. In the United States overlay, 46 CFR 63.25-7(c), as amended on 12 June 2024 (89 FR 50198), requires exhaust-gas boilers to alarm on high fluid temperature or low flow and on soot fire in the uptake.
Degraded oil is the precursor: cracked and oxidized fluid lays carbon on the heater tubes, which overheats the tube wall. ABS 4-4-1/13.1.2 requires sampling means and onboard test facilities, and the fluid maker’s maximum film temperature (375 °C for Therminol 66) is the limit the heater design has to respect at the tube wall.
Steam supply from the boiler plant
On a steam-heated tanker, cargo heating competes with fuel heating and the hotel load for the auxiliary boiler’s output, and heat-up is limited by what the boiler can spare. At sea an exhaust-gas economizer or other waste heat recovery system supplies part of the holding load from main-engine exhaust; in port and at low engine load the oil-fired boiler carries it all. The worked example above, 14.9 tonnes of steam an hour to lift 30,000 tonnes by 15 K in a day, shows why heat-up is spread over the passage.
The same plant heats the ship’s own fuel oil system, and the inert gas system on older tankers draws on the same boiler uptake. The heating plan is a joint document between the chief officer, who owns the cargo temperatures, and the chief engineer, who owns the steam. Boiler design, feed-water treatment and condensate chemistry sit with the boiler plant rather than the cargo system.
Limitations
This article states the international and class position for commercial tankers. It does not cover cargo cooling and reliquefaction on gas carriers, heated ISO tank containers, or inland tank barges under national rules.
The Codex temperature table is from the 2015 revision of CXC 36-1987, and Codex records a 2026 modification that may have changed individual rows. The FOSFA and PORAM heating tables are available only to members and are not reproduced here. Class rule references are to the Lloyd’s Register July 2022 and ABS 2018 editions; later editions renumber sections, and DNV, BV, ClassNK and other societies set their own figures. The charter-party wording is from the published forms, and a fixed charter’s riders frequently replace it.
The survey reference is IACS UR Z10.4 Rev.17 (May 2022); a later revision applies to surveys from 1 July 2024. The charter-party wording is taken from published copies of the forms, and ASBATANKVOY 2025 is not covered.
The heat-duty and steam figures are worked examples with stated inputs. A real heating calculation uses the ship’s approved \(U\) values, the tank geometry, the ballast condition and the sea and air temperatures on the route, and the heat-up example’s specific heat is an assumption, not a property of any named crude.
Frequently Asked Questions (FAQs)
What is a cargo tank heating system?
It is the shipboard plant that keeps a tanker’s cargo warm enough to pump and cool enough to stay on specification.
Heat is carried by saturated steam, thermal oil or hot water, either through coils laid in the cargo tank or through a heat exchanger on deck that the cargo is circulated through. Crude and product tankers, chemical and vegetable-oil tankers, bitumen carriers and molten-sulfur tankers carry it.
Does the IBC Code require a chemical tanker to have cargo heating?
No. IBC Code 7.1.1 opens with ‘When provided’: the Code sets construction, fitting and testing rules for any heating or cooling system a ship has, but it does not itself require heating for any product.
Whether a cargo needs heat is set by its properties, the shipper’s declaration under IBC 16.2.6 and 16.2.9, and the charterer’s instructions.
Which column in IBC Code chapter 17 shows that a product needs heating?
None does. Column l is fire protection (A, B, C, D or No) under the legend in MSC.460(101).
Heating-related duties reach a product only through the column o cross-references, for example 16.2.6 and 16.2.9 for palm oil, 15.10 and 16.2.9 for molten sulfur, and 16.6 for products that must not be exposed to excessive heat.
When does the IBC Code require a cargo temperature alarm?
IBC Code 7.1.5.4 requires an alarm system that monitors cargo temperature when overheating or overcooling could result in a dangerous condition.
For every heated cargo, 7.1.5 requires means of measuring the cargo temperature, of the restricted or closed type where column j of chapter 17 requires it.
Why must the heating medium be at a higher pressure than the cargo?
So a leaking coil lets heating medium into the cargo rather than cargo into the heating circuit, from where it could reach the boiler or engine room.
IBC Code 7.1.4, LR Pt 5 Ch 15 6.4.5 and 46 CFR 153.434 all require it. LR allows the alternative of draining and blanking the circuit when it is not in use.
What steam pressure may be used to heat vegetable oils?
Codex CXC 36-1987, paragraph 4.1.1, says steam should not exceed 150 kPa (1.5 bar) gauge, which the Code equates to about 127 °C.
The Code prefers hot water at about 80 °C (paragraph 3.1.5). Both are recommendations; they bind a ship when a sale contract, charter party or national rule incorporates them.
How fast may a vegetable oil cargo be heated?
Codex CXC 36-1987, paragraph 4.1.1, sets a maximum rate of 5 °C over any 24-hour period.
Raising palm oil from the 40 °C top of its voyage range to the 50 °C bottom of its discharge range therefore takes at least two days, and the heat-up has to start at least that far from the discharge port.
At what temperature is palm oil carried?
Codex CXC 36-1987, Table 1 (2015 revision), gives 32 to 40 °C during the voyage and 50 to 55 °C at loading and discharge.
Palm olein is 25 to 30 °C on voyage and 32 to 35 °C at discharge; palm stearin is 40 to 45 °C on voyage and 60 to 70 °C at discharge.
What happens if the charterer gives no heating instructions for a vegetable oil cargo?
Under paragraph 4 of the FOSFA Operational Procedures, the FOSFA Heating Instructions or the PORAM Heating Instructions apply, and the temperature of the oil or fat has to be recorded daily.
If receivers ask, the master or an authorized agent provides a signed chart of those temperatures.
What material must heating coils be made of for edible oils?
Stainless steel. FOSFA Qualifications, A 2.3.1, requires heating coils within tanks and the tubes and shell of heat exchangers to be stainless steel only.
Codex CXC 36-1987, 3.1.5, recommends stainless coils and states that coils of alloys containing copper are not suitable.
When may heating coils be switched on in a vegetable oil tank?
Only once the coils are completely covered.
Codex CXC 36-1987, 4.1.1, requires full coverage before heating begins. The same paragraph sets the 5 °C per 24 hours rate limit.
Is a cargo temperature log required by MARPOL?
No IMO instrument requires a voyage temperature log.
The duty comes from contracts and national rules: BPVOY4 clause 24 requires noon temperature reports for each tank, FOSFA Operational Procedures 4 require a daily record, and in United States waters 46 CFR 153.908 requires two discharge temperature readings entered in the Cargo Record Book.
How long must the Cargo Record Book be kept?
Three years after the last entry: MARPOL Annex II regulation 15.5.
The Cargo Record Book records stripping, prewash and discharge operations; it is not a temperature log, although its item 9.1 entry for emptying and stripping refers to the stripping temperature set by the Procedures and Arrangements Manual.
What does the P&A Manual say about cargo heating?
MARPOL Annex II appendix 4, section 3.4, requires the Procedures and Arrangements Manual to give the heating requirements for cargoes that must be at a minimum temperature during unloading, the control of the heating system and the method of temperature measurement.
Section 3.5 covers the procedures when those conditions cannot be met, including failure of the cargo tank heating system.
What is a solidifying substance under MARPOL Annex II?
A noxious liquid substance with a melting point below 15 °C that is unloaded less than 5 °C above its melting point, or one with a melting point of 15 °C or more that is unloaded less than 10 °C above it (regulation 1).
A Category Y solidifying substance triggers the appendix 6 prewash under regulation 13.7.1.3.
What is a high-viscosity substance under MARPOL Annex II?
A Category X or Y substance with a viscosity of 50 mPa·s or more at the unloading temperature (regulation 1).
Because the test is taken at the unloading temperature, heating a cargo before discharge can take it out of the high-viscosity class and out of the regulation 13.7.1.3 prewash. It does not remove the regulation 13.7.1.4 prewash for persistent floaters, which tests viscosity at 20 °C.
How hot must prewash water be for a solidifying substance?
At least 60 °C, under MARPOL Annex II appendix 6, unless the properties of the substance make washing less effective at that temperature.
Appendix 6 also says tanks that carried a solidifying substance should, where possible, be heated before washing. The United States rule at 46 CFR 153.1108(b) sets the same 60 °C (140 °F) at the tank-washing machine.
Which ships fall under MARPOL Annex I heavy grade oil rules?
Oil tankers of 600 tonnes deadweight and above carrying heavy grade oil, under regulation 21 of the revised Annex I (MEPC.117(52)).
Heavy grade oil is crude above 900 kg/m³ at 15 °C, fuel oil above 900 kg/m³ at 15 °C or above 180 mm²/s at 50 °C, and bitumen, tar and their emulsions. Most of those cargoes need heating.
Why is thermal oil used instead of steam for very hot cargoes?
Steam pressure rises steeply with temperature: saturated steam at 200 °C is at 15.55 bar absolute and at 300 °C at 85.9 bar absolute (IAPWS-IF97).
A thermal-oil circuit reaches those temperatures with an expansion tank vented to the weather, so the circuit pressure is set by pumping rather than by the boiling point.
Is thermal oil safer because it has a high flash point?
No. Eastman gives Therminol 66 a closed-cup flash point of 170 °C against a maximum bulk temperature of 345 °C, and states the fluid is not fire-resistant.
A leak from a working circuit is above its flash point and close to its autoignition temperature, which is why SOLAS II-2/4.2.4 treats heating-system oils as flammable oils.
What is the maximum heating medium temperature on an oil tanker?
Lloyd’s Register rules (July 2022, Pt 5 Ch 15, 1.5.1 and 6.3.2) set 220 °C in general for steam or other fluid in pipes and heating coils in cargo spaces of oil tankers.
On chemical and gas tankers the limit is the temperature class of the electrical equipment required in the cargo area.
How are heating coils pressure tested?
After installation on board, to 1.5 times the design pressure and not less than 0.4 MPa (4 bar): LR Pt 5 Ch 12, 8.2.1, and ABS 4-6-2/7.3.3(b).
At the hull renewal survey of a double-hull oil tanker, IACS UR Z10.4 Rev.17, 2.2.1.3, has cargo and ballast piping inside tanks examined and tested to working pressure; Z10.4 does not name heating coils.
How is a leaking heating coil detected at sea?
By the condensate. LR Pt 5 Ch 15, 6.4.3, requires steam and water returns to lead to an observation tank in a well-lit part of the machinery space remote from the boilers, where oil or chemical in the condensate can be seen.
A falling cargo temperature on one tank with normal steam supply is the other signal.
Why test heating coils before loading a sour crude?
ISGOTT 5th edition, 11.1.9.2, calls for the coils to be tested so hydrogen sulfide cannot transfer into the low-pressure steam system through a leak.
What must a heating system for toxic cargo do differently?
IBC Code 7.1.6 applies where column o lists 15.12, 15.12.1 or 15.12.3.
The heating circuit must be independent and not enter the machinery space, or be external to the tank, or be sampled for cargo before it recirculates, with the coil return tested at the start of heating and on first use after an unheated toxic cargo.
What is the risk of heating a tank next to a heat-sensitive cargo?
Heat conducts through the common bulkhead.
IBC Code 16.6.1 requires products liable to polymerize, decompose or evolve gas from local overheating to be segregated from hot cargoes. In the Stolt Groenland casualty at Ulsan on 28 September 2019, MAIB Report 9/2021 found that styrene monomer had been affected by heat from adjacent heated tanks and that its temperature was not monitored.
Who pays for fuel burned heating the cargo on a voyage charter?
The published forms address the extra fuel for a change of temperature: where charterers ask for the cargo to be raised, SHELLVOY 6 clause 27, BPVOY4 clause 25 and ExxonMobil VOY2005 clause 25 make charterers pay for the additional bunkers.
The fixed charter’s riders decide anything the form leaves open.
Who pays for heating fuel on a time charter?
Charterers, because they provide and pay for all fuel except domestic fuel under SHELLTIME 4 clause 7(a).
Clause 24(a) states the speed and consumption warranty for all purposes except cargo heating and tank cleaning, so heating consumption does not count against the owner’s warranty.
What heating temperature does a tanker warrant under BPVOY4?
BPVOY4 clause 24 has owners undertake that the ship can maintain cargo temperature up to 60 °C throughout the laden voyage and discharge, and charterers may instruct the loaded temperature to be maintained up to that maximum.
Clause 25 lets charterers call for a raise up to 60 °C if the voyage is long enough.
What is the SHELLVOY 6 heating obligation?
Clause 27: if charterers require heating, the ship shall maintain the cargo at the loaded temperature or the temperature stated in Part I (A)(iv), whichever is lower, on passage to and at the discharge ports.
A requested raise or reduction is a best-endeavours obligation, with charterers paying for extra bunkers and delay counting as laytime or demurrage.
Is the ASBATANKVOY heating duty strict?
No. ASBATANKVOY Part II clause 1 requires the owner to exercise due diligence to maintain the temperatures requested, and requires the heating coils to be in good working order only so far as due diligence can achieve it.
SHELLVOY 6 clause 27 is worded as a direct obligation to maintain the loaded temperature.
What is the time bar for a heating claim under SHELLVOY 6?
Ninety days. SHELLVOY 6 clause 6(3) bars heating claims unless they reach owners fully documented within 90 days of completion of discharge.
The same clause covers demurrage and other listed claims.
Can a cold cargo void the owner's pumping warranty?
Under SHELLVOY 6 Part I (A)(vii), the discharge pumping warranty applies only if the cargo’s kinematic viscosity does not exceed 600 centistokes at the discharge temperature charterers require.
A cargo that arrives colder and thicker than that falls outside the warranty.
Is cargo heating care of the cargo or management of the ship?
In CSAV v MS ER Hamburg [2006] EWHC 483 (Comm), the court treated the Hague-Visby Article IV rule 2(a) question as one of fact and upheld the finding that heating a bunker tank to feed the engines was management of the ship, because it did not relate to the care of the cargo.
Applying that care-of-cargo test to cargo heating points to Article III rule 2 rather than the management exception, but that is an application of the test, not a holding of the case.
What does the seller of palm oil have to do about heating under FOSFA 81?
Tender documents. FOSFA/PORAM/MEOMA Contract No. 81 (September 2011 revision) lists a FOSFA Combined Master’s Certificate and a copy of the notice to the master instructing the master to follow the PORAM Heating Instructions among the shipping documents.
Heating on the voyage is then the carrier’s responsibility.
What port state control deficiency codes cover cargo heating?
The Paris MoU list of deficiency codes (1 July 2024) has 14205, cargo heating systems for Category Y substances, and 12105, temperature control.
There is no code for a missing temperature log, because no convention requires one.
How much steam does a heating coil use?
Divide the heat duty by the enthalpy drop of the steam.
With 6 bar gauge supply (2,763 kJ/kg) and condensate returned at 90 °C (377 kJ/kg), each kilogram gives up 2,386 kJ, so a 500 kW duty needs 0.21 kg/s, about 750 kg/h.
Can waste heat supply cargo heating?
Yes. An exhaust-gas economizer or exhaust-gas thermal-oil heater recovers main-engine exhaust heat at sea.
ABS 4-4-1/13.5 requires an exhaust-gas thermal-oil heater to have a fixed fire-extinguishing and cooling system in the exhaust piping, and in the United States 46 CFR 63.25-7(c) requires exhaust-gas boilers to alarm on high fluid temperature, low flow and soot fire.
How big should the heating coils be for an edible oil tank?
Codex CXC 36-1987, 3.1.5, gives about 0.1 m² of coil surface per tonne of tank capacity where the fat has to be melted, and 0.05 m² per tonne where it only has to be heated up.
The coils sit on legs about 7.5 cm (3 inches) above the tank bottom.
Where should the cargo temperature be measured?
For edible oils, Codex CXC 36-1987 takes the average of top, middle and bottom readings, each at least 30 cm from the coils.
For US-regulated hazardous cargo, 46 CFR 153.440 requires a remote-reading thermometer at the bottom of a heated tank, plus one at mid-height for high-viscosity cargo and cargo melting above 0 °C.
Can a thermal-oil heater run with only one high-temperature trip?
No, under Lloyd’s Register rules. LR Pt 5 Ch 14, 12.1.4 and Table 14.12.1, require a first-stage high-temperature alarm and a second-stage burner shut-off, with the second-stage sensors and circuits independent of the first.
ABS 4-4-1 Table 7 lists outlet high temperature among the shutdowns.
What is the corrosion allowance on steam heating coils?
ABS Rules for Building and Classing Marine Vessels (2018), 4-6-2 Table 3, sets 2.0 mm for steam heating coils in cargo tanks, against 0.8 mm for saturated steam piping elsewhere.
The difference reflects coils sitting in cargo, tank washings and condensate at the same time.
No question matches. Try a shorter or different word.
Sources
- IMO Resolution MSC.176(79), amendments to the IBC Code, adopted 10 December 2004. chapter 7 cargo temperature control, 15.10, 15.13 and 16.6 imo.org
- IMO Resolution MSC.460(101), amendments to IBC Code chapters 17, 18, 19 and 21, in force 1 January 2021. chapter 17 column legend and column o entries imo.org
- IMO Resolution MEPC.118(52), revised MARPOL Annex II, adopted 15 October 2004. regulations 1, 13, 15 and 16, appendices 4 and 6 imo.org
- IMO Resolution MEPC.117(52), revised MARPOL Annex I, adopted 15 October 2004. regulation 21 heavy grade oil imo.org
- 46 CFR Part 153, Ships Carrying Bulk Liquid, Liquefied Gas, or Compressed Gas Hazardous Materials. 153.430 to 153.440, 153.908, 153.1002 and 153.1108 ecfr.gov
- Codex Alimentarius CXC 36-1987, Code of Practice for the Storage and Transport of Edible Fats and Oils in Bulk, 2015 revision. 3.1.5, 3.1.8, 4.1.1 and Table 1 fosfa.org
- FOSFA Qualifications and Operational Procedures for Ships Engaged in the Carriage of Oils and Fats in Bulk, 1 April 2020. A 2.3.1 and Operational Procedures 4 fediol.eu
- Lloyd's Register Rules and Regulations for the Classification of Ships, July 2022. Pt 5 Ch 12 8.2.1, Ch 14 12.2 and Ch 15 1.5.1 and Section 6 archive.org
- ABS Rules for Building and Classing Marine Vessels 2018, Part 4. 4-4-1/13 thermal oil heaters and 4-6-2/7.3.3 coil testing ww2.eagle.org
- IACS UR Z10.4 Rev.17 (May 2022), Hull Surveys of Double Hull Oil Tankers. 2.2.1.3 and Annex I classnk.or.jp
- CSAV v MS ER Hamburg Schiffahrtsgesellschaft mbH & Co KG [2006] EWHC 483 (Comm) caselaw.nationalarchives.gov.uk
- MAIB Report 9/2021, Stolt Groenland. cargo tank explosion and fire, Ulsan, 28 September 2019 assets.publishing.service.gov.uk
- Eastman Therminol 66 heat transfer fluid, technical bulletin TF-8695A eastman.com