Tandem Lift Operations
Lifting one load on two cranes: load sharing and its uncertainty, the derating applied to combined capacity, synchronization, and the planning a tandem lift needs.
A tandem lift takes one load on two lifting appliances working together, which is how a ship with two 350 tonne cranes moves a 600 tonne module without carrying a 700 tonne crane. Multipurpose and heavy lift vessels are built for it, with cranes positioned and their foundations designed so that the pair can work a single load over a hatch or over the side.
The full article will explain why the combined certified capacity is not the sum of the two individual capacities. Load sharing between two hooks is uncertain, and the uncertainty grows with any difference in hoist speed, rope stretch, boom deflection or ship heel, so a share that starts at fifty-fifty can migrate under load. Class rules and manufacturers therefore apply a derating to the combined figure, and the derated value is the one the certificate carries.
It will cover the execution: synchronizing hoist and slew across two machines, whether by a linked control system or by a single operator with a combined console, the rigging geometry that keeps the load level, the heel the lift induces and how it is checked against the stability booklet before the load leaves the deck, and the abort case where one crane loses drive with the load in the air.