Tonnage measurement is the method that turns the volume of a ship’s enclosed spaces into two dimensionless numbers, gross tonnage (GT) and net tonnage (NT). The method is set by the International Convention on Tonnage Measurement of Ships, 1969, in force since 18 July 1982. GT measures the overall size of a ship. NT measures its useful capacity. Both are volumes turned into indices, not weights.
GT and NT decide which rules apply to a ship and how much it pays. SOLAS, MARPOL, the MLC 2006 and the STCW Convention set their thresholds in GT. Port authorities charge port dues and pilotage on tonnage, and many states levy a tonnage tax on it. The Suez Canal and the Panama Canal use canal systems of their own. This article covers the Convention method, its limits, the certificate and these uses. The separate articles on gross tonnage and net tonnage treat each figure in more depth.
What tonnage measures
Tonnage measures volume: GT measures the overall size of a ship, and NT its useful capacity (Article 2(4) and 2(5)). Neither figure is a mass. A ship of GT 50,000 does not weigh 50,000 tonnes.
The weights of a ship are different quantities. Displacement is the mass of the ship and everything on board. Deadweight is the mass the ship can carry, and lightweight is the mass of the empty ship. The article on lightweight versus deadweight explains these. The stub on light displacement tonnage covers the empty-ship weight used in ship recycling and naval practice.
Older systems counted volume in register tons of 100 cubic feet, the unit of the Oslo Convention of 1947. The 1969 Convention dropped the unit. Its GT and NT are numbers with no unit, and certificates print them that way.
| Quantity | What it measures | Basis | Unit |
|---|---|---|---|
| Gross tonnage (GT) | Overall size | Volume of all enclosed spaces, ITC 69 Annex I Reg.3 | none |
| Net tonnage (NT) | Useful capacity | Cargo space volume, draught ratio and passengers, Reg.4 | none |
| Displacement | Total mass | Immersed volume times water density | tonnes |
| Deadweight | Carrying capacity | Displacement less lightweight | tonnes |
| Gross register tonnage (GRT) | Overall size, pre-1969 | Internal volume in register tons of 100 cubic feet | register tons |
Scope and application of the 1969 Convention
The 1969 Convention applies to ships engaged on international voyages that fly the flag of a Contracting Government (Article 3(1)). The International Conference on Tonnage Measurement of Ships, convened by IMCO, adopted the Convention in London on 23 June 1969. It entered into force on 18 July 1982, 24 months after the Article 17(1) conditions were met on 17 July 1980. Those conditions were 25 States with fleets of at least 65 per cent of world gross tonnage.
Which ships
Article 3(2) lists four groups of ships:
- New ships, whose keel was laid, or which were at a similar stage of construction, on or after 18 July 1982 (Article 2(6)).
- Existing ships with alterations that the Administration deems a substantial variation in their gross tonnage.
- Existing ships whose owner requests measurement under the Convention.
- All existing ships from 18 July 1994, twelve years after entry into force.
The fourth group carries a condition. Under Article 3(2)(d), those ships “shall retain their then existing tonnages” for the requirements of other existing international conventions. So an existing ship received a Convention certificate in 1994 but kept its old tonnage for those thresholds. Interpretation A.3(2)(d)-1 of TM.5/Circ.6 defines a substantial variation as a change of more than 1 per cent in the Convention GT, up or down. An owner who asks for Convention measurement cannot later return to the old national rules (Article 3(3)).
Which ships are excluded
Article 4(1) excludes ships of war and ships of less than 24 metres (79 feet) in length. Length is the load line length of Article 2(8). That length is 96 per cent of the waterline length at 85 per cent of least moulded depth, or stem to rudder stock if greater. Article 4(2) also excludes ships that navigate only these waters:
- the Great Lakes and the St Lawrence River, to a line near Anticosti Island;
- the Caspian Sea;
- the Plate, Parana and Uruguay rivers.
The stub on Great Lakes load lines covers the parallel exclusion in the load line regime. Any tonnage measurement of a ship under 24 metres falls under national rules; the stub on yacht and small-craft tonnage collects those systems.
Gross tonnage: the formula
Gross tonnage is K1 times V, where V is the total enclosed volume in cubic metres (Annex I, Regulation 3). K1 is 0.2 + 0.02 log10 V. The Administration can take K1 from the formula or from the table in Appendix 2, at its discretion (interpretation R.3-1).
Gross tonnage
where
| \(\mathit{GT}\) | gross tonnage, stated rounded down without decimals (TM.5/Circ.6, R.3-2) | |
| \(K_{1}\) | coefficient from the formula or the Appendix 2 table | |
| \(V\) | total volume of all enclosed spaces | m³ |
Calculate gross and net tonnage (ITC 69 Regulations 3 and 4) on ShipCalculators.com →
K1 grows slowly with volume. Appendix 2 gives 0.26 at 1,000 cubic metres, 0.28 at 10,000, 0.30 at 100,000 and 0.32 at 1,000,000. K1 is a straight line on a log scale of volume, so GT rises slightly faster than volume. A ship ten times larger in volume has a GT about 10.7 times larger.
Enclosed and excluded spaces
V is the sum of every enclosed space in the ship, above and below the upper deck. Regulation 2(4) defines an enclosed space as any space bounded by the hull, by partitions or bulkheads, and by decks or coverings. Permanent or movable awnings do not count as coverings. An opening in a deck, an opening in the hull or a missing bulkhead does not take a space out of V. Closability is not the test.
Figure 1 shows the main groups of spaces in an example cargo ship. The engine room, the accommodation and the forecastle are enclosed spaces in V. The cargo holds are also in V, and form the cargo volume Vc as well.
Regulation 2(5)(a) to (e) lists five kinds of excluded space, open to the weather in defined ways:
- A space in an erection opposite an end opening extending from deck to deck, of at least 90 per cent of the deck breadth.
- A space under an overhead deck covering open to the sea and weather, connected to the hull only by stanchions.
- A space in a side-to-side erection between opposite side openings of at least 0.75 metres or one third of the erection height, whichever is greater.
- A space in an erection directly below an uncovered opening in the deck above, limited to the area of the opening.
- A recess in the boundary bulkhead of an erection, no wider inside than its entrance and no deeper than twice the entrance width.
An excluded space goes back into V if it meets any one of three conditions in Regulation 2(5). It is fitted with shelves or other means for securing cargo or stores. Its openings are fitted with any means of closure. Its construction provides any possibility of closing them. The stub on enclosed and excluded spaces holds the full rules.
TM.5/Circ.6 adds further limits. Enclosed spaces above the upper deck, appendages and spaces open to the sea of not more than 1 cubic metre are not measured (R.6-1). Machinery, mooring and towing equipment, winches and cranes are not part of V (R.2(4)-9). MSC.1/Circ.1546 of 6 June 2016 treats heat exchangers in hull recesses or outside the hull as machinery under R.2(4)-9.
Measurement and rounding
Regulation 6(1) measures volumes to the inner side of the shell or structural boundary plating on a metal ship, whatever the insulation. On a ship of another material the outer surface of the shell is used. Appendage volumes are included (Regulation 6(2)), and spaces open to the sea can be excluded (Regulation 6(3)). Regulation 7 takes measurements to the nearest centimetre or one twentieth of a foot. The volume calculation uses generally accepted methods, such as Simpson’s rules on the hydrostatic sections, and must be detailed enough to permit easy checking.
The final GT is rounded down to a whole number. Interpretation R.3-2 of TM.5/Circ.6 states that the tonnage certificate figure “should be given in rounded down figures without decimals”. A computed GT of 499.93 is therefore certified as 499, not 500. At the 500 GT threshold of SOLAS that difference changes the rules that apply.
Worked example: gross tonnage
Two example ships serve every figure and example in this article. They are illustrations of the formulas, not measurements of real ships.
- Ship A is a bulk carrier with V 42,500 cubic metres, Vc 34,000 cubic metres, d 12.80 m, D 18.20 m and no passengers.
- Ship B is a ro-pax ferry with V 12,000 cubic metres, Vc 2,500 cubic metres, d 4.20 m and D 7.80 m. It carries 200 passengers in cabins of not more than 8 berths (N1) and 400 other passengers (N2).
To find the gross tonnage of ship A:
- Take log10 of V: log10 42,500 = 4.6284.
- Calculate K1 = 0.2 + 0.02 × 4.6284 = 0.292568.
- Multiply: GT = 0.292568 × 42,500 = 12,434.13.
- Round down: the certificate states GT 12,434.
For ship B, K1 = 0.281584 and GT = 3,379.00, certified as 3,379. Figure 2 shows both ships on the K1 line.
The same formula gives the volume a ship needs to reach each threshold. With rounding down, GT 300 needs 1,149 cubic metres of enclosed volume, GT 500 needs 1,884 cubic metres and GT 5,000 needs 17,551 cubic metres. These volumes are the site’s arithmetic on Regulation 3.
Net tonnage: the formula and its limits
Net tonnage is K2 Vc (4d/3D)² plus K3 (N1 + N2/10), a cargo term plus a passenger term (Annex I, Regulation 4(1)). It is not GT less deductions, as net register tonnage was. It is calculated directly from the cargo space volume, the draught and the passenger numbers.
Net tonnage
where
| \(\mathit{NT}\) | net tonnage, stated rounded down without decimals (TM.5/Circ.6, R.4-2) | |
| \(V_{c}\) | total volume of the cargo spaces | m³ |
| \(d\) | moulded draught amidships, chosen under Regulation 4(2) | m |
| \(D\) | moulded depth amidships, Regulation 2(2) | m |
| \(K_{2}\) | coefficient of the cargo volume | |
| \(K_{3}\) | coefficient of the passenger term | |
| \(N_{1}\) | passengers in cabins with not more than 8 berths | |
| \(N_{2}\) | other passengers | |
| \(\mathit{GT}\) | gross tonnage of the ship, Regulation 3 |
Vc is the total volume of the cargo spaces. Regulation 2(7) defines them as enclosed spaces for cargo to be discharged from the ship, and included in GT. Each is marked CC in letters at least 100 millimetres high. TM.5/Circ.6 sets out what Vc includes:
- slop tanks (R.2(7)-4), dual-purpose ballast and cargo spaces (R.2(7)-10) and spaces for passenger cars (R.2(7)-11);
- mail rooms, separate baggage rooms and passenger bonded stores (R.2(7)-7);
- not segregated ballast tanks that are not used for cargo (R.2(7)-1);
- not crew and passenger provision rooms or crew bonded stores (R.2(7)-7).
For independent tanks, as on gas carriers with independent tanks, Vc is measured to the structural boundary of the tanks (R.2(7)-9).
The draught d and the draught factor
The draught d is the moulded draught amidships, chosen in the order of Regulation 4(2):
- For a ship under the Load Lines Convention, the summer load line draught, not a timber load line.
- For a passenger ship, the deepest subdivision load line assigned under SOLAS.
- For a ship with a national load line, the summer load line so assigned.
- For a ship with no load line but a national draught limit, the maximum permitted draught.
- For any other ship, 75 per cent of the moulded depth amidships.
D is the moulded depth amidships of Regulation 2(2), from the top of the keel to the underside of the upper deck at side. The factor (4d/3D)² equals 1 when d is 0.75 D. Regulation 4(1)(a) caps it at 1, so a deep-draught ship gains nothing above that ratio. The factor reduces NT only where the assigned draught is less than 75 per cent of the depth. Such a ship has a large freeboard for its depth. It does not change with the draught at which the ship sails on a voyage.
Figure 3 shows the factor against d/D. Ship A, at d/D 0.703, has a factor of 0.879.
The passenger term
The passenger term is K3 (N1 + N2/10), with K3 = 1.25 (GT + 10,000)/10,000. N1 is the number of passengers in cabins with not more than 8 berths. N2 is the number of other passengers. N1 + N2 is the total number of passengers the ship’s passenger certificate permits. Interpretation R.2(6)-1 takes both numbers from the Administration’s maritime safety authority. Under Regulation 2(6), a passenger is every person other than the master and the persons employed on board on the ship’s business. A child under one year is not a passenger. When N1 + N2 is less than 13, both are taken as zero.
A passenger in a cabin of not more than 8 berths counts ten times as much as any other passenger. Ship B, of GT 3,379, has K3 = 1.672. Each N1 passenger adds 1.67 to its NT, and each N2 passenger adds 0.17.
The two floors
Regulation 4(1) sets two lower limits:
Limits on net tonnage
where
| \(K_{2}\,V_{c}\left(\frac{4d}{3D}\right)^{2}\) | cargo term of net tonnage | |
| \(\mathit{GT}\) | gross tonnage | |
| \(\mathit{NT}\) | net tonnage; N1 and N2 are taken as zero when N1 + N2 is less than 13 |
- The cargo term K2 Vc (4d/3D)² is not taken as less than 0.25 GT (Regulation 4(1)(b)).
- The net tonnage is not taken as less than 0.30 GT (Regulation 4(1)(c)).
For a ship with no passengers the 0.25 GT floor never decides NT. NT then equals the cargo term or 0.30 GT, whichever is greater. The 0.25 GT floor matters for a passenger ship, because the passenger term is added on top of it. Figure 4 shows the cargo floor for ship B.
Worked example: net tonnage
To find the net tonnage of ship A:
- Calculate K2 = 0.2 + 0.02 log10 34,000 = 0.290630.
- Calculate 4d/3D = (4 × 12.80)/(3 × 18.20) = 0.937729. Square it: 0.879336. The factor is less than 1, so the cap does not apply.
- Calculate the cargo term: 0.290630 × 34,000 × 0.879336 = 8,689.07.
- Compare with 0.25 GT = 3,108.50. The cargo term is higher, so it stands.
- Ship A has no passengers, so the passenger term is zero.
- Compare with 0.30 GT = 3,730.20. The cargo term is higher, so it stands.
- Round down: the certificate states NT 8,689, 70 per cent of GT.
To find the net tonnage of ship B:
- Calculate K2 = 0.267959 and the factor (4 × 4.20/(3 × 7.80))² = 0.515450.
- Calculate the cargo term: 0.267959 × 2,500 × 0.515450 = 345.30.
- Compare with 0.25 GT = 844.75. The cargo term is lower, so 844.75 is taken.
- Calculate K3 = 1.25 × 13,379/10,000 = 1.672375, and N1 + N2/10 = 200 + 40 = 240.
- Calculate the passenger term: 1.672375 × 240 = 401.37.
- Add: 844.75 + 401.37 = 1,246.12. The sum is higher than 0.30 GT = 1,013.70, so it stands.
- Round down: the certificate states NT 1,246.
Figure 5 shows how each net tonnage is built up against its gross tonnage.
Change of net tonnage
Regulation 5 controls how NT changes after an alteration. An alteration of V, Vc, d, N1 or N2 that increases NT is applied “without delay” (Regulation 5(1)). A ship with two load lines, under Regulation 4(2)(a) and (b), gets one NT, for the load line of its trade (Regulation 5(2)).
A decrease is slower. Under Regulation 5(3), a certificate with a lower NT “shall not be issued until twelve months have elapsed” from the current issue. It has three exceptions:
- a transfer of the ship to another flag;
- an alteration the Administration deems of a major character, such as removal of a superstructure that requires a new load line;
- a passenger ship carrying large numbers of unberthed passengers in special trades, such as the pilgrim trade.
The stub on change of net tonnage collects the practice under these rules.
Gross tonnage and net tonnage compared
GT and NT come from different volumes: GT measures size, NT measures useful capacity, and each authority chooses which to charge on. Recommendation 2 of the 1969 Conference asked that GT and NT be accepted as the parameters wherever conventions, laws and regulations use those terms. It asked authorities that charge on tonnage to consider which parameter is most appropriate.
| Point | Gross tonnage | Net tonnage |
|---|---|---|
| Definition, Article 2 | Overall size of the ship | Useful capacity of the ship |
| Volume used | V, all enclosed spaces | Vc, cargo spaces marked CC |
| Other inputs | none | d, D, N1, N2, and GT through K3 and the floors |
| Formula | K1 V (Reg.3) | K2 Vc (4d/3D)² + K3 (N1 + N2/10) (Reg.4(1)) |
| Lower limit | none | 0.30 GT; cargo term at least 0.25 GT |
| Change after alteration | Certificate ceases if GT would rise (Art.10(1)) | Rise without delay; fall after 12 months (Reg.5) |
The International Tonnage Certificate (1969)
Every ship whose GT and NT are determined under the Convention receives an International Tonnage Certificate (1969) (Article 7). The flag Administration determines the tonnages (Article 6). It can entrust measurement to recognized persons or organizations, usually a classification society acting as a recognized organization. The Administration keeps full responsibility for the result.
The certificate follows the model in Annex II. It records the distinctive number or letters, the port of registry, the keel or alteration date, the length, the breadth and the moulded depth. It then lists GT and NT, the spaces in each, the passenger numbers, the moulded draught and the excluded spaces. Interpretation A.9(2)-1 gives only the year of the keel date, except in 1982 and 1994, where the day and month also appear. Another Contracting Government can issue a certificate at the flag’s request (Article 8). No certificate is issued to a ship of a non-Contracting State (Article 8(4)).
The stub on the International Tonnage Certificate covers the form in detail.
When the certificate ceases
The Convention sets no expiry date. Article 10(1) ends the certificate when an alteration “would necessitate an increase” in GT or NT. The alteration can be in arrangement, construction, capacity, use of spaces, passenger numbers, load line or permitted draught. A transfer of flag also ends it (Article 10(2)). On a transfer to another Contracting Government, the old certificate stays valid for up to three months or until replaced (Article 10(3)). Interpretation A.10(2)-1 recommends remeasurement of a ship whose certificate does not comply with the agreed interpretations.
Port state inspection
Article 12 limits what port state control can check under this Convention. An officer of another Contracting Government can verify that the ship holds a valid certificate and that its main characteristics correspond to the certificate. The article adds: “In no case shall the exercise of such inspection cause any delay to the ship.” Under interpretation A.12-1, a copy of the tonnage calculations can be given to the master. It is not a requirement.
Interpretations and reduced gross tonnage
IMO keeps the uniform application of the Convention through unified interpretations, now TM.5/Circ.6 of 19 May 2014 and MSC.1/Circ.1546 of 6 June 2016. TM.5/Circ.6 was approved at MSC 93 on a proposal of the Sub-Committee on Ship Design and Construction. It superseded TM.5/Circ.5, agreed at MSC 63 in 1994. The circulars interpret the Convention. They do not amend its text.
Reduced gross tonnage for fees
Two IMO recommendations give a reduced GT for tonnage-based fees. Neither changes the certified GT.
The first is Resolution A.747(18) of 4 November 1993, for oil tankers with segregated ballast tanks. The certificate Remarks state the tonnage of the tanks as K1 times their volume. A.747(18) recommends that port, harbour and pilotage authorities use GT less that figure. A.747(18) applies to tanks certified as segregated in the supplement to the IOPP Certificate and used for ballast only.
Reduced gross tonnage of a segregated ballast oil tanker
where
| \(\mathit{GT}_{\mathrm{red}}\) | reduced gross tonnage for tonnage-based fees | |
| \(\mathit{GT}\) | gross tonnage, Regulation 3 | |
| \(K_{1}\) | the ship's K1, from its total enclosed volume V | |
| \(V_{b}\) | total volume of the segregated ballast tanks, measured under Regulation 6 | m³ |
The second is Resolution MSC.234(82), for open-top containerships. An open-top container ship has holds without hatch covers over at least 66.7 per cent of the clear hatch opening area. MSC.234(82) treats it as a novel craft under Regulation 1(3) and takes the upper deck as if hatch covers were fitted. MSC.234(82) recommends a reduced GT of 0.9 GT for fee assessment, without limit of size, entered under Remarks. The stub on reduced gross tonnage covers both schemes.
Reduced gross tonnage of an open-top containership
where
| \(\mathit{GT}_{R}\) | reduced gross tonnage for fee assessment, entered under Remarks on the certificate | |
| \(\mathit{GT}\) | gross tonnage, Regulation 3, with the upper deck taken as if hatch covers were fitted |
The stub on tonnage convention interpretations follows TM.5/Circ.6 item by item.
Gross tonnage thresholds in IMO and ILO instruments
Most safety, pollution and labour instruments set their scope in GT. MARPOL Annex VI and the MLC 2006 define GT by Annex I of the 1969 Convention. MARPOL Annex VI Regulation 2, as revised by MEPC.328(76), defines gross tonnage by the tonnage regulations “contained in Annex I” to the Convention. It adds “or any successor Convention”. MLC 2006 Article II(1)(c) does the same, and for ships under the interim scheme takes the GT in the Remarks column of the certificate.
| Instrument and provision | Threshold |
|---|---|
| SOLAS 1974 Reg.I/3(a)(ii) | Regulations do not apply to cargo ships of less than 500 GT, unless expressly provided otherwise |
| SOLAS Chapter IV, GMDSS | All passenger ships and cargo ships of 300 GT and upwards on international voyages |
| SOLAS Chapter XI-2 and the ISPS Code | Passenger ships and cargo ships of 500 GT and upwards on international voyages |
| MARPOL Annex I Reg.6.1, surveys | Oil tankers of 150 GT and above; other ships of 400 GT and above |
| MARPOL Annex VI Regs 5 and 6, surveys and IAPP | Ships of 400 GT and above |
| MARPOL Annex VI Reg.19, Chapter 4 (EEDI, EEXI, SEEMP) | Ships of 400 GT and above, subject to the ship-type tables |
| MARPOL Annex VI Reg.27 (IMO DCS) and Reg.28 (CII) | Ships of 5,000 GT and above |
| MLC 2006 Reg.5.1.3 | Maritime labour certificate and DMLC for ships of 500 GT or over on international voyages |
| MLC 2006 Standard A3.1 | Accommodation bands at 3,000 GT and 10,000 GT |
MEPC.328(76), in force on 1 November 2022, is the current text of Annex VI and added the EEXI and CII to Chapter 4. The EU MRV Regulation also covers ships of 400 to 5,000 GT from 1 January 2025. The EU regimes, the EU ETS for shipping and FuelEU Maritime, are regional overlays with their own 5,000 GT scope. The ISM Code and the Ballast Water Management Convention also use GT thresholds; their articles state them.
The MLC 2006 applies to all ships ordinarily engaged in commercial activities. The 500 GT figure is the certification threshold, not the scope. Article II(6) lets a Member apply some provisions differently to ships of less than 200 GT not engaged on international voyages.
Thresholds under the old tonnage
Because of Article 3(2)(d), an existing ship can still apply a threshold on its old tonnage. IMO bridged the change with interim schemes:
- Resolution A.494(XII) of 19 November 1981 replaced A.389(X) of 1977. It let a ship use its pre-1969 national gross tonnage for SOLAS, shown on the SOLAS certificate only.
- Resolution A.540(13) of 17 November 1983 extended that scheme to STCW 1978.
- Resolution A.541(13) of 17 November 1983 gave a similar scheme for MARPOL 73/78, for ships of less than 600 tons gross under national measurement.
All three schemes are now spent. Resolution A.494(XII) did not apply to ships with keels laid after 31 December 1985, apart from limited cases that ran until 18 July 1994. Resolution A.758(18) of 4 November 1993 lets the certificate show the old national GT under Remarks. The stub on interim tonnage schemes covers them.
What tonnage pays for
Tonnage is the base for many port dues, canal tolls, tonnage tax regimes and limits of liability. The choice of GT or NT belongs to each authority, as Recommendation 2 of the 1969 Conference left it.
Port authorities and pilotage services set their tariffs in GT or NT per call or per day. The disbursement account of a port call shows how those charges add up, and pilotage tariffs often use the same base. Tonnage tax regimes compute the taxable profit of a shipping company from the tonnage of its fleet, not from its accounts. The tonnage tax article covers the national bands. In voyage estimation the canal and port costs follow from these figures.
Under the LLMC as amended by its 1996 Protocol, the limits of liability rise with the ship’s tonnage. These limits bind the States Party to the Protocol. The 2012 amendments were adopted on 19 April 2012 and entered into force on 8 June 2015. The limit for loss of life or personal injury is 3.02 million SDR up to 2,000 GT. The limit then rises by 1,208 SDR per ton from 2,001 to 30,000 GT, by 906 SDR to 70,000 GT, and by 604 SDR above. For other claims the limit is 1.51 million SDR up to 2,000 GT, plus 604, 453 and 302 SDR per ton in the same bands.
Canal and national systems
The Suez and Panama canals, the United States and the shipbuilding industry each keep a tonnage system of their own beside the 1969 Convention. These systems start from the ship’s measured volumes but give different numbers.
Suez Canal net tonnage
Suez Canal dues are charged on Suez Canal Net Tonnage (SCNT). Article 92 A of the Suez Canal Authority Rules of Navigation, December 2020 edition, defines the basis. It is the net tonnage of the system of the International Commission held at Constantinople in 1873. The figure is entered on the Suez Canal Special Tonnage Certificate. A ship presents it with its calculation sheets on its first transit (Article 15 A(1)).
Article 92 also adds double-bottom tanks used for bunkers during the transit to the dues tonnage. A ship without a valid certificate pays provisionally on Suez Canal Gross Tonnage. SCNT has no fixed ratio to ITC 69 NT. The stub on Suez Canal net tonnage covers the measurement and the rates.
Panama Canal Universal Measurement System
The Panama Canal charges many ship types on the Panama Canal Universal Measurement System (PC/UMS) net tonnage, in use for tolls since 1 October 1994. The Panama Canal Authority (ACP) approved its Regulations for the Admeasurement of Vessels by Agreement No. 358 of 12 December 2019. Article 10 sets PC/UMS net tonnage as K4(V) + K5(V). V is the same total volume as in the 1969 Convention. Appendix E sets K4 = (0.25 + 0.01 log10 V) × 0.830.
The ACP records the figure on its Toll Basis Certificate, after admeasurement by ACP personnel or authorized agents. Not every segment pays on PC/UMS. Container ships pay on TEU allowance, dry bulk carriers on deadweight and gas carriers on cubic metres of cargo capacity. The articles on PC/UMS and Panama Canal tolls give the detail.
United States: 46 CFR Part 69
US federal rules on tonnage are in 46 CFR Part 69, administered by the US Coast Guard. Part 69 has four systems:
- the Convention Measurement System, Subpart B;
- the Standard Regulatory Measurement System, Subpart C;
- the Dual Regulatory Measurement System, Subpart D;
- the Simplified Regulatory Measurement System, Subpart E.
The Convention system does not apply to a vessel of less than 79 feet in overall length (46 CFR 69.11(a)(2)). The US uses overall length here, where the Convention uses the Article 2(8) length. The other exclusions in that section include vessels on the Great Lakes only and some US-flag vessels with keels laid before 1 January 1986. The Simplified system is an option for vessels under 79 feet, non-self-propelled vessels and pleasure vessels (46 CFR 69.11(d)).
US law therefore uses two tonnage vocabularies. Under 46 CFR 69.20, a threshold written as “gross tonnage” or “GT ITC” uses Convention tonnage. A threshold written as “gross tons”, “registered gross tons” or “GRT” uses regulatory tonnage. The owner of a US-flag vessel with a keel laid on or before 18 July 1982 can apply the older thresholds on regulatory tonnage. The stub on US tonnage measurement covers the four systems.
Compensated gross tonnage
Compensated gross tonnage (CGT) measures shipbuilding work, not the ship. The OECD Council Working Party on Shipbuilding promulgated the CGT System 2007, in use from 1 January 2007. The shipbuilders’ associations of Europe, Japan and Korea developed it. Paragraph 35 sets the formula.
Compensated gross tonnage
where
| \(\mathit{cgt}\) | compensated gross tonnage, a measure of shipbuilding work content | |
| \(A\) | factor for the ship type | |
| \(B\) | exponent for the influence of ship size | |
| \(\mathit{gt}\) | gross tonnage of the ship |
| Ship type, OECD CGT System 2007 | A | B |
|---|---|---|
| Oil tankers, double hull | 48 | 0.57 |
| Chemical tankers | 84 | 0.55 |
| Bulk carriers | 29 | 0.61 |
| General cargo ships | 27 | 0.64 |
| Full container ships | 19 | 0.68 |
| LNG carriers | 32 | 0.68 |
| Ferries | 20 | 0.71 |
| Passenger ships | 49 | 0.67 |
A complex ship of a given GT carries more work than a simple one, so its A and B give more CGT per GT. Example ship A, a bulk carrier of GT 12,434, gives about 9,120 CGT on the bulk carrier factors. The system exists to compare shipbuilding output across ship types. The stub on compensated gross tonnage covers the full table.
How tonnage shapes ship design
Because fees and rules follow GT and NT, the tonnage rules shape hull forms. The pre-1969 national rules exempted shelter-deck spaces, and owners built open shelter-deck ships to keep the register tonnage low.
IMCO Resolution A.48(III) of 18 October 1963 addressed this. It recommended exempting from gross tonnage certain closed spaces on or above the uppermost complete deck, and between it and the second deck. The condition was that a tonnage mark on the ship’s side was not submerged. The 1969 Convention ended that approach. Under Regulation 2(4) an enclosed space counts in V whatever its openings, so the tonnage mark has no function. The stub on the shelter deck and tonnage mark covers the older rules.
Under the 1969 rules a designer still chooses which spaces are enclosed and which qualify as excluded spaces. The decisions sit inside the wider hull form design and the choice of depth against freeboard. The draught factor rewards a high freeboard: a ship whose assigned draught is below 0.75 D gets a lower NT. A tonnage threshold also creates a design target. A cargo ship under GT 500 is outside every SOLAS regulation that does not expressly reach lower. A ship under GT 5,000 is outside the IMO DCS.
Bulk carriers, oil tankers, ro-ro ships and passenger ships measure very differently. A ro-ro or car deck adds a large V with modest cargo weight. That is one reason why the GT of a ship and its deadweight cannot be converted into each other without the ship’s own data.
History: from tuns to the 1969 Convention
Every national tonnage system before 1969 went back to the method devised by George Moorsom of the British Board of Trade in 1854. Each state adapted that system, so the same ship had different tonnages under different flags. Figure 6 shows the main steps.
The Suez Canal took its own measure early. Its dues followed the system of the International Commission held at Constantinople in 1873. Article 92 A of the SCA rules keeps that basis today.
Eight European states signed the Convention for a uniform system of tonnage measurement of ships at Oslo on 10 June 1947. The Oslo Convention entered into force on 30 December 1954, and its regulations used the register ton of 100 cubic feet. Its member countries met on shelter-deck questions in Reykjavik in 1961, as recorded in Resolution A.48(III). The stub on the Oslo Tonnage Convention covers it.
The 1969 Conference, convened by IMCO in London, replaced these systems with one formula of volume and no deductions. The 1969 Convention took 13 years to enter into force and 25 years to reach all existing ships. The stubs on the history of tonnage measurement and on GRT and NRT cover the earlier systems in detail.
Limitations
- The worked examples and figures use two example ships. Their volumes are illustrative and do not come from a real tonnage calculation.
- The examples use the rounded GT in K3 and in the floors. The Convention does not say whether the rounded or the unrounded GT applies there; the difference is less than one unit of NT.
- The Appendix 2 table and the log formula can differ in the fourth decimal of K1 or K2. The Administration chooses which to use (R.3-1, R.4-1).
- The threshold table lists the general scope provisions. Each instrument has exceptions by ship type, voyage and date; the instrument text governs.
- Regulation 4(1)(b) read literally applies the 0.25 GT floor to a ship with no cargo spaces. Confirm the treatment with the Administration for such a ship.
- National tonnage tax bands, port tariffs and canal rates change often. This article does not state them; the linked articles and the issuing authority give current figures.
- The CGT factors are those of the 2007 System. A later revision, if issued, would govern.
Frequently Asked Questions (FAQs)
Is gross tonnage a weight?
No, gross tonnage is not a weight.
It is a dimensionless number from the volume of a ship’s enclosed spaces, K1 times V under Annex I Regulation 3 of the 1969 Convention. Displacement and deadweight are the weights, in tonnes.
What is the difference between gross tonnage and net tonnage?
Gross tonnage measures the overall size of a ship and net tonnage its useful capacity, under Article 2(4) and 2(5) of the 1969 Convention.
GT comes from the volume of all enclosed spaces. NT comes from the volume of the cargo spaces, corrected for draught, plus a term for passengers.
Why does gross tonnage have no unit?
Gross tonnage has no unit because the Convention defines it as a function of volume, not as a volume.
GT equals K1 times V, and K1 is a dimensionless coefficient. Certificates state GT as a plain number. The old tonnage systems used the register ton of 100 cubic feet, which was a unit.
What is the difference between GRT and GT?
GRT, gross register tonnage, was the total internal volume in register tons of 100 cubic feet under national rules derived from the Moorsom system.
GT is the 1969 Convention figure, K1 times V, with no unit. The two numbers differ for the same ship, most of all where the old rules exempted shelter-deck spaces.
What is the difference between NRT and NT?
NRT, net register tonnage, was gross register tonnage less deductions for spaces such as the engine room and crew spaces under national rules.
NT under the 1969 Convention is not GT less deductions. It is computed directly from the cargo space volume, the draught ratio and the number of passengers.
When did gross tonnage replace gross register tonnage?
Gross tonnage replaced gross register tonnage for new ships from 18 July 1982, when the 1969 Convention entered into force.
Existing ships kept their old tonnages until 18 July 1994. After that date an existing ship still keeps its old tonnage for the requirements of other existing conventions under Article 3(2)(d).
Which ships does the 1969 Tonnage Convention apply to?
The Convention applies to ships engaged on international voyages that fly the flag of a Contracting Government, under Article 3.
It does not apply to ships of war or to ships of less than 24 metres in length (Article 4). Ships that navigate only the Great Lakes and St Lawrence, the Caspian Sea, or the Plate, Parana and Uruguay rivers are also outside it.
Are ships under 24 metres measured under the 1969 Convention?
No, ships of less than 24 metres in length are outside the Convention under Article 4(1)(b).
The length is the Article 2(8) length, 96 per cent of the waterline length at 85 per cent of the least moulded depth. Stem to rudder stock is used if greater. Any measurement of these ships falls under national rules.
What is an existing ship under the Tonnage Convention?
An existing ship is any ship that is not a new ship under Article 2(7).
A new ship has its keel laid, or is at a similar stage, on or after 18 July 1982 (Article 2(6)). The test is the keel date, not the contract or delivery date.
What is the 1 per cent rule in tonnage measurement?
The 1 per cent rule defines a substantial variation in gross tonnage.
Under interpretation A.3(2)(d)-1 of TM.5/Circ.6, an alteration that changes Convention GT by more than 1 per cent is substantial. The ship then falls under Article 3(2)(b) and loses the benefit of its old tonnage.
Who measures the ship and issues the International Tonnage Certificate?
The Administration of the flag state determines GT and NT and issues the International Tonnage Certificate (1969) under Articles 6 and 7.
It can entrust the measurement to recognized persons or organizations, usually classification societies, but it keeps full responsibility for the certificate.
How long is an International Tonnage Certificate valid?
The Convention sets no expiry date on the International Tonnage Certificate (1969).
The certificate ceases to be valid under Article 10 when an alteration would increase GT or NT, or when the ship changes flag. On a transfer to another Contracting Government it stays in force for three months at most, or until the new certificate is issued.
What happens to the tonnage certificate when a ship changes flag?
The certificate ceases to be valid on a transfer of flag under Article 10(2) of the 1969 Convention.
If the new flag is a Contracting Government, the old certificate stays valid for up to three months or until replaced. The certificate is not endorsed over to the new flag.
Can an owner reduce net tonnage immediately after an alteration?
No, a lower net tonnage cannot be certified until 12 months after the current certificate was issued, under Regulation 5(3).
The exceptions are a flag transfer, a major alteration such as removing a superstructure, and passenger ships in the pilgrim trade and similar special trades. An increase in NT applies without delay.
Can net tonnage be lower than 30 per cent of gross tonnage?
No, net tonnage cannot be taken as less than 0.30 GT under Regulation 4(1)(c).
A second floor applies to the cargo term alone, which cannot be less than 0.25 GT under Regulation 4(1)(b). For a ship without passengers the 0.30 GT floor always governs when the cargo term is small.
How are passengers counted in net tonnage?
Passengers enter net tonnage through the term K3 times (N1 + N2/10).
N1 counts passengers in cabins with not more than 8 berths. N2 counts the other passengers permitted by the passenger certificate. When N1 + N2 is less than 13, both are taken as zero under Regulation 4(1).
Which draught is used in the net tonnage formula?
The draught d is the moulded draught amidships chosen under Regulation 4(2).
For a ship under the Load Lines Convention it is the summer load line draught, not a timber load line. Passenger ships use the deepest subdivision load line under SOLAS. A ship with no load line or draught limit uses 75 per cent of moulded depth.
How are gross tonnage and net tonnage rounded?
Both are rounded down to a whole number with no decimals.
Interpretations R.3-2 and R.4-2 of TM.5/Circ.6 state that the final figure in the tonnage certificate should be given in rounded down figures without decimals. A computed GT of 12,434.13 is certified as 12,434.
Are ballast tanks included in gross tonnage?
Yes, ballast tanks are enclosed spaces and their volume is part of V, so they count in gross tonnage.
Segregated ballast tanks are not part of the cargo volume Vc under interpretation R.2(7)-1 of TM.5/Circ.6. Resolution A.747(18) recommends a reduced gross tonnage for fees that removes their share.
What is reduced gross tonnage?
Reduced gross tonnage is a lower GT figure that IMO recommends port, harbour and pilotage authorities use for tonnage-based fees.
Resolution A.747(18) gives oil tankers GT less K1 times the segregated ballast tank volume. Resolution MSC.234(82) gives 0.9 GT for open-top containerships. Both are recommendations and do not change the certified GT.
What do the letters CC on a cargo hold mean?
CC means cargo compartment. Regulation 2(7) requires each cargo space in Vc to carry a permanent marking CC, in letters not less than 100 millimetres (4 inches) high.
The marking lets a surveyor match the spaces on board with the spaces in the net tonnage calculation.
Are cranes and winches included in the enclosed volume?
No, machinery, mooring and towing equipment, winches, revolving cranes, truss cranes and similar items are not included in V under interpretation R.2(4)-9 of TM.5/Circ.6.
MSC.1/Circ.1546 of 6 June 2016 treats heat exchangers in hull recesses or outside the hull as machinery under that interpretation, not as appendages.
How are novel craft measured?
Under Regulation 1(3), the Administration determines the tonnage of a novel craft where the Annex I rules are unreasonable or impracticable.
It communicates the method to IMO. Interpretation R.1(3)-1 of TM.5/Circ.6 limits this to craft novel in design. Open-top containerships are treated this way under MSC.234(82).
Why does a ship certificate sometimes show two gross tonnages?
Some certificates show the old national tonnage under Remarks next to the Convention GT.
Resolution A.758(18) of 4 November 1993 allows that entry for existing ships remeasured under Article 3(2)(d). The entry is deleted if the ship undergoes an alteration affecting tonnage on or after 18 July 1994.
What is the shelter-deck tonnage mark?
The tonnage mark was a mark on the ship’s side used under pre-1969 national rules.
IMCO Resolution A.48(III) of 18 October 1963 recommended exempting certain spaces from gross tonnage. The condition was that the tonnage mark was not submerged. The 1969 Convention has no tonnage mark.
Does Suez Canal net tonnage equal ITC 69 net tonnage?
No, Suez Canal net tonnage is a separate canal measure.
Article 92 A of the Suez Canal Authority Rules of Navigation, December 2020 edition, sets the basis. The basis is the system of the International Commission at Constantinople, 1873. It is entered on a Suez Canal Special Tonnage Certificate.
Is Panama Canal PC/UMS tonnage the same as gross tonnage?
No, PC/UMS net tonnage is a canal measure that starts from the same total volume V but uses its own coefficient.
Article 10 of the ACP Admeasurement Regulations, approved by ACP Agreement No. 358 of 12 December 2019, sets PC/UMS net tonnage as K4(V) + K5(V). The ACP records it on the Toll Basis Certificate.
Does the US Coast Guard accept ITC 69 tonnage?
Yes, the Convention Measurement System is Subpart B of 46 CFR Part 69.
US law also keeps regulatory measurement systems for vessels outside the Convention, under 46 CFR 69.11. A US vessel can therefore have both a Convention tonnage and a regulatory tonnage, and 46 CFR 69.20 says which applies to each threshold.
What is CGT and who uses it?
CGT, compensated gross tonnage, is a shipbuilding measure that weights gross tonnage by ship type and size to show the work content of a ship.
The OECD CGT System 2007, developed by the shipbuilders associations of Europe, Japan and Korea, sets cgt = A times gt to the power B. It lets yard output of different ship types be compared on one scale.
Does the MLC 2006 apply only to ships of 500 GT and above?
No, the Maritime Labour Convention, 2006 applies to all ships ordinarily engaged in commercial activities.
The 500 GT figure in Regulation 5.1.3 is the threshold for the maritime labour certificate and the declaration of maritime labour compliance. The accommodation standards in Standard A3.1 also use 3,000 GT and 10,000 GT bands.
Where can I find a ship's gross tonnage?
The authoritative source is the International Tonnage Certificate (1969) on board, issued by the flag Administration.
Where a register or database shows a different figure, check whether it shows an old national tonnage under Remarks or a reduced GT for fees.
Is the 1969 Tonnage Convention being revised?
As of November 2026 the current interpretations of the Convention are TM.5/Circ.6 of 19 May 2014 and MSC.1/Circ.1546 of 6 June 2016.
The Convention text itself has not been amended since its adoption in 1969.
Can an owner reduce gross tonnage legitimately in design?
Yes, a designer can arrange spaces so that they qualify as excluded spaces under Regulation 2(5), such as open spaces under an overhead deck.
The exclusion is lost if the space is fitted with shelves, any means of closure, or any possibility of closure. Tonnage-based fees then apply to the lower GT.
How does gross tonnage affect liability limits?
The LLMC limits of liability rise with the ship’s tonnage, for States Party to the 1996 Protocol.
Under the 2012 amendments, in force from 8 June 2015, the personal claims limit is 3.02 million SDR up to 2,000 GT. Fixed amounts per ton are added above that. Property claims start at 1.51 million SDR.
No question matches. Try a shorter or different word.
Sources
- United Nations Treaty Series Vol. 1291, No. I-21264. International Convention on Tonnage Measurement of Ships, 1969 treaties.un.org
- IMO Convention page. International Convention on Tonnage Measurement of Ships, 1969 imo.org
- IMO TM.5/Circ.6 (19 May 2014). Unified interpretations relating to the International Convention on Tonnage Measurement of Ships, 1969 register-iri.com
- IMO MSC.1/Circ.1546 (6 June 2016). Unified interpretation of the 1969 TM Convention mardep.gov.hk
- IMO Resolution A.747(18). Application of tonnage measurement of segregated ballast tanks in oil tankers imo.org
- IMO Resolution MSC.234(82). Recommendations concerning tonnage measurement of open-top containerships imo.org
- IMO Resolution A.494(XII). Revised interim scheme for tonnage measurement for certain ships imo.org
- IMO Resolution A.758(18). Application of Recommendation 2 of the International Conference on Tonnage Measurement of Ships, 1969 imo.org
- IMO Resolution MEPC.328(76). 2021 revised MARPOL Annex VI imo.org
- ILO Maritime Labour Convention, 2006. Text of the Convention ilo.org
- IMO Convention page. Convention on Limitation of Liability for Maritime Claims (LLMC), 1976 imo.org
- US 46 CFR Part 69. Measurement of Vessels ecfr.gov
- United Nations Treaty Series Vol. 208, No. 2814. Convention for a uniform system of tonnage measurement of ships, Oslo, 1947 treaties.un.org
- Panama Canal Authority Agreement No. 358 (12 December 2019). Regulations for the Admeasurement of Vessels to Assess Tolls for Use of the Panama Canal pancanal.com
- Suez Canal Authority. Rules of Navigation in the Suez Canal, December 2020 Edition suezcanal.gov.eg
- United Nations Treaty Series Vol. 1184, No. I-18961. International Convention for the Safety of Life at Sea, 1974 treaties.un.org
- OECD Council Working Party on Shipbuilding. Compensated Gross Ton (CGT) System 2007, copy hosted by VSM vsm.de